Skip to content
S1587Senate2019-2020 SessionSame asA3203

Require Construction Waste Recycling

Official title

“Requires contractors in certain large cities to recycle 50% of the waste generated on construction and demolition sites”

Sponsor James Sanders Jr.SD-10Affects Local Government
Status
In Senate Committee
Cities
Impact
8/10
Significant
Passage
0%

Bill progress

Step 2 of 7

In committee · Cities

What's happening

This bill requires contractors in New York City to recycle or reuse a significant portion of construction and demolition waste, with penalties for noncompliance.

Why it matters

  1. Targets the largest construction projects. in New York City—such as large residential and non-residential buildings—so it could have a substantial impact on the volume of waste diverted from landfills in densely populated urban areas.

  2. Sets escalating recycling/reuse requirements. The law would begin with a 25% requirement and increase to 50% after a year, pushing the construction industry to rapidly adopt new waste management practices and potentially spurring innovation in recycling and material reuse.

  3. Establishes strict accountability and verification mechanisms,. including mandatory documentation, potential audits, and significant daily fines for non-compliance. This makes compliance not just voluntary or aspirational, but a regulated, enforceable obligation for contractors.

  4. Creates flexibility through waivers and city oversight,. acknowledging that not all projects can meet the requirements due to technical, legal, or practical constraints—while still maintaining strong incentives for maximum compliance.

The daily · weekday mornings

Albany, before your first meeting.

Every bill that moved yesterday, summarized in a sentence and ranked by impact. The Albany Scorecard follows on Sundays.

Free. Unsubscribe in one click. Want alerts on specific bills? Create an account.

Who cares

  • General contractors and demolition subcontractors

    On covered projects in cities with at least one million residents, they would have to recycle or reuse 25% of debris by weight initially and 50% for later permit applications, document compliance and face fines for violations.

  • City buildings departments

    They would administer compliance documentation and waivers, block new permits for contractors with overdue documentation and have authority to audit contractors and withhold certificates of occupancy.

  • Property owners with covered projects

    They could face delayed certificates of occupancy and could apply for a waiver if a contractor is unavailable or refuses to provide required documentation.

  • Permitted recycling and solid waste facilities

    The recycling requirements would create a compliance role for facilities handling covered materials such as metal, wood, concrete, brick and asphalt.

Headline styles

Require Construction Waste Recycling

Plain English, a few words. Used as the page title.

Sponsors

Primary sponsor
James Sanders Jr.

Senator · Senate District 10

Chair, Banks

No co-sponsors yet.

History

  1. Referred to cities
  2. Referred to cities

Companion bill

The same bill in the other chamber. A bill becomes law when one version passes both houses and the governor signs it, so either number can carry it.

A3203Assembly

Require Construction Waste Recycling

In Assembly Committee · Ways And Means · Sponsor William Colton

Impact 7 · Significant0% to pass

Full text

3 pagesUnderlined is new[Struck] is removedOfficial text on nysenate.gov ↗

STATE OF NEW YORK

1587

2019-2020 Regular Sessions

IN SENATE

January 15, 2019

Introduced by Sen. SANDERS -- read twice and ordered printed, and when printed to be committed to the Committee on Cities

AN ACT to amend the general city law, in relation to requiring contractors in certain cities to recycle construction and demolition site waste

The People of the State of New York, represented in Senate and Assembly, do enact as follows:

Section 1. Legislative intent. The purpose of this act is to significantly reduce the amount of waste produced by construction and demolition activities in cities having populations of one million or more. There are many opportunities to reduce or recycle materials from construction and demolition, including metals, cardboard, drywall, glass, wood and asphalt. This act is consistent with the goals of large cities' solid waste management plans, complementing other recycling and recovery programs currently in effect.

§ 2. The general city law is amended by adding a new section 23-a to read as follows:

§ 23-a. Construction and demolition site waste recycling; certain cities. 1. Definitions. As used in this section:

a. "Contractor" means a general contractor and shall also include any subcontractor engaged in the demolition or wrecking of a structure for which a permit is required.

b. "Construction and demolition debris" shall include, but not be limited to, metals, cardboard, drywall, glass, wood, concrete, brick and asphalt, but shall not include any material that is contaminated by lead, asbestos or any other hazardous material such that recycling thereof would be illegal or unfeasible.

c. "Recycler" means a recycling facility, transfer station or other solid waste management facility permitted pursuant to the environmental conservation law.

EXPLANATION--Matter in italics (underscored) is new; matter in brackets

[ ] is old law to be omitted.

LBD03752-01-9

S. 1587 2

d. "Reuse" means (i) the on-site use of reprocessed construction and demolition debris if the use of such debris is authorized by the city department of buildings; and (ii) the off-site redistribution of a material which would otherwise be disposed of, for use in the same or similar form as it was produced.

2. Applicability. a. The provisions of this section shall apply only in cities having a population of one million or more.

b. Contractors shall recycle or reuse construction and demolition debris produced on site as part of construction or demolition activities by meeting the following requirements:

(1) on a project that is issued a permit with an application date within one year of the effective date of this section, the contractor shall cause to be recycled or reused at least twenty-five percent of the construction and demolition debris, as measured by weight, produced on site.

(2) on a project that is issued a permit with an application date a year or more after the effective date of this section, the contractor shall cause to be recycled or reused at least fifty percent of the construction and demolition debris, as measured by weight, produced on site.

c. The following projects shall be subject to the provisions of this section:

(1) Construction of new residential buildings with four or more dwelling units;

(2) Construction of new non-residential buildings, other than projects for which the total area is four thousand square feet or less;

(3) Any rehabilitation of non-residential buildings of more than four thousand square feet that will require a certificate of occupancy to be issued from the city;

(4) Demolition of residential buildings with four or more dwelling units that includes the demolition of at least one outside wall; and

(5) Demolition of non-residential buildings, other than projects for which the total area is four thousand square feet or less.

d. A project shall be exempt from the provisions of this section if only a plumbing permit or only an electrical permit is required for such project.

3. Contractor responsibilities. a. Within thirty days of completion of a project, the contractor shall submit documentation to report compliance with this section and the regulations promulgated pursuant to this section. If the contractor is unable to meet the recycling and reuse requirements of this section, the contractor may apply for a waiver from the city. Such documentation shall be in a form and manner determined by the city department of buildings.

b. If a contractor is unable or refuses to submit the required documentation, a property owner may submit a waiver application supported by an affidavit that the contractor is unavailable or refuses to provide the required documentation.

c. A contractor shall comply with all reasonable requests for information and documentation by the city department of buildings pursuant to an audit to monitor compliance with this section. Documentation required by this section shall be maintained for at least three years.

4. City responsibilities. a. The city shall establish a procedure for contractors to apply for waivers of the requirements of this section. Such requirements shall include documentation of the amount of material the contractor is actually able to recycle or reuse and the reason or

S. 1587 3

reasons for which the contractor cannot meet the recycling and reuse requirements in this section.

b. The city shall not issue any new building or demolition permit to a contractor who has failed to timely submit the required documentation with respect to any completed project, until such contractor either submits (1) the required documents including, where applicable, proof that any fine due pursuant to subdivision five of this section has been paid in full, or (2) proof of a waiver issued by the city and, the payment of any fine due.

c. The city may withhold a certificate of occupancy for a project until the contractor submits either the required documentation including, where applicable, proof that any fine due pursuant to subdivision five of this section has been paid in full; or proof of a waiver issued by the city and, the payment of any fine due.

d. The city is authorized to conduct audits of contractors to determine and validate compliance with the requirements of this section. The city may request information and documentation relevant to such an audit from any contractor.

e. The city is authorized to promulgate such rules and regulations as necessary to implement the provisions of this section. Such rules and regulations shall contain provisions for seeking and obtaining a waiver from the provisions of this section.

5. Fines and penalties. a. Contractors who fail to provide the documentation required by this section or who have not received a waiver from the city shall be subject to a fine of five hundred dollars for each day that they fail to provide the information or apply for a waiver.

b. Contractors who fail to meet the recycling or reuse requirements of this section and have applied for and not received a waiver from the city shall be assessed a fine as follows:

(1) for projects involving ten thousand square feet or more of renovated, newly constructed or demolished space, five hundred dollars for each percentage point of difference between the amount required by this section to be recycled or reused and the amount actually recycled or reused; and

(2) for projects involving less than ten thousand square feet of renovated, newly constructed or demolished space, two hundred fifty dollars for each percentage point of difference between the amount required by this section to be recycled or reused and the amount actually recycled or reused.

c. The city may modify the penalties required by paragraph a or b of this subdivision for failure to provide documentation or meet the recycling and reuse requirements, if it finds that there are extenuating circumstances for such failures.

§ 3. This act shall take effect on the first of January next succeeding the date on which it shall have become a law.

Reflowed for reading: line numbers and page breaks removed. Cite the official text.

Sponsor's memo

Title of bill

An act to amend the general city law, in relation to requiring contrac- tors in certain cities to recycle construction and demolition site waste

Purpose

The purpose of the bill is to reduce the solid waste disposal from Construction and Demolition sites by requiring a contractor to use or recycle at least 50% of the Construction and Demolition debris.

Summary of provisions

The bill requires that contractors in New York City reuse or recycle a) 25% by weight of the Construction and Demolition debris, for those project which have been issued a permit with an application date within one year of the effective date of the bill; and b) 50% by weight of Construction and Demolition debris for those projects issued a permit with an application of more than one year after the effective date of the bill. The bill defines the types of projects that would be subject to the recycling/reuse requirements. Contractors would be required to document their Construction and Demolition debris recycling/reuse. The bill contains penalties for violations of the requirements of the program.

Existing law

New law

Justification

According to a study released by the NYC Department of Sanitation (DOS), 60% of the solid waste stream consists of construction and debris mate- rials. The purpose of the legislation is to significantly reduce the amount of waste produced by construction and demolition activities. There are many opportunities to reduce or recycle materials, including metals, cardboard, drywall, glass, wood, glass and asphalt, from Construction and Demolition sites. Although New York City has a volun- tary Construction and Demolition reuse and recycling program and has produced a manual for contractors on how to manage these wastes, there is no requirement to do so. Furthermore, NYC has failed to include Construction and Demolition waste reuse and recycling in its Solid Waste Management Plan update. Given continuing problems with managing garbage, this bill could significantly reduce materials going into landfills by requiring their reuse and recycling.

The DOS estimates that 60% of fill materials and 40% of non-fill materi- als are currently being recycled. This legislation requires a 50% rate after one year of enactment, and poses no significant financial burden to contractors. In fact, a study released by The Boston Society of Architects states that recycling construction and debris materials is considerably less-expensive than the cost attributed to hauling the waste to a landfill and paying tonnage fees. These savings are realized even after all costs for planning, training, recordkeeping, and report- ing are factored in.

Legislative history

01/06/16 Referred to Cities 02/04/15 Referred to Cities

Fiscal implications

None

Local fiscal implications

The bill will have minimum administrative impacts on New York City.

Effective date

This act would take effect January one after it becomes law.

Summaries, headlines and scores are AI-generated from the official bill text. How we score bills. Source: NYS Open Legislation.