What's happening
This bill establishes requirements and procedures for converting master-metered residential rental buildings to submetered electric billing in New York.
Why it matters
Strengthens tenant notification and input. The bill requires building owners to provide detailed, written notice to all tenants about proposed submetering, including economic justifications, the technology to be used, complaint procedures, and tenant protections. It also mandates a public comment period and a public hearing near the affected building, giving tenants a formal voice in the process.
Imposes transparency and consumer protections. Owners must disclose projected rates, ensure charges will not exceed local utility rates, and outline how complaints and protections (consistent with the Home Energy Fair Practices Act) will be handled. This aims to prevent price gouging and safeguard tenants' rights during and after conversion.
Mandates energy efficiency and support for vulnerable tenants. Applicants are required to plan for replacing non-Energy Star appliances with more efficient models, potentially lowering tenants’ energy costs. Additionally, the bill ensures continued electric service for tenants receiving utility assistance, protecting low-income residents from utility shutoffs during the transition.
Allows for independent tenant-driven review. If at least half of the tenants request it, the owner must pay for an independent energy analysis of the building, chosen from bids submitted by tenants. This empowers tenants to verify the owner’s claims about energy use and potential savings, adding a layer of accountability.
Establishes a two-stage approval process. The Public Service Commission must grant conditional approval for one year, with final approval contingent on actual usage and rate data. This phased approach lets regulators and tenants review real-world impacts before permanent conversion, and provides a process for denied applications to be reconsidered.
Albany, before your first meeting.
Every bill that moved yesterday, summarized in a sentence and ranked by impact. The Albany Scorecard follows on Sundays.
Free. Unsubscribe in one click. Want alerts on specific bills? Create an account.
Headline styles
Switch to Individual Utility Meters
Plain English, a few words. Used as the page title.
Sponsors
3 Co-sponsors
1 Multi-sponsor
History
- Enacting clause stricken
- Referred to energy
Full text
3 pagesUnderlined is new[Struck] is removedOfficial text on nysenate.gov ↗
STATE OF NEW YORK
4041
2021-2022 Regular Sessions
IN ASSEMBLY
February 1, 2021
Introduced by M. of A. RODRIGUEZ, SEAWRIGHT, GOTTFRIED, PICHARDO -- Multi-Sponsored by -- M. of A. GLICK -- read once and referred to the Committee on Energy
AN ACT to amend the public service law, in relation to converting residential rental buildings from being mass-metered to submetered
The People of the State of New York, represented in Senate and Assembly, do enact as follows:
Section 1. Section 53 of the public service law is renumbered section 54 and a new section 53 is added to read as follows:
§ 53. Residential rental building submetering. 1. A master-metered residential rental building may be converted to be submetered if the owner of the building files an application to convert the building to submetering with the commission, provided that:
(a) The applicant applying to provide submetered electric service includes with the application a procedure for notifying in writing, within thirty days of filing the application with the commission, all tenants of record of the proposal to submeter. The notification shall:
(i) include a summary of the information provided to the commission;
(ii) inform tenants that a public comment period has commenced;
(iii) state the date after which comments directed to the commission will no longer be accepted;
(iv) prominently display the address and telephone number of the nearest public service commission office;
(v) state the date, time, and location of the public hearing set by the commission to hear testimony from the public;
(vi) direct the tenant where on the public service commission's website the entire application can be viewed, as well as to provide a toll-free telephone number and address from which a tenant of record may request a copy of the complete application to be mailed to such tenant at no cost to the tenant;
EXPLANATION--Matter in italics (underscored) is new; matter in brackets
[ ] is old law to be omitted.
LBD03028-01-1
A. 4041 2
(vii) include a statement substantiating any economic advantages of submetering over direct utility metering at the premises proposed to be submetered;
(viii) include a description of the type of submetering system to be installed and a validation of its reliability and accuracy;
(ix) state the method and basis for calculating rates to tenants, which shall include a maximum rate provision preventing charges to tenants from exceeding the tariffed rates and charges for service from the local distribution utility;
(x) state complaint procedures and tenant protections consistent with the Home Energy Fair Practices Act; and
(xi) demonstrate that satisfactory arrangements have been made with the local department of social services to provide continued electric service upon acceptance of vendor payment of utility assistance grants in accordance with the state plan for regular and emergency home energy assistance under section ninety-seven of the social services law, the emergency utility assistance program under section one hundred thirtyone-s of the social services law, and in accordance with other provisions of the social services law or regulations of the office of temporary and disability assistance relating to utility assistance payments.
(b) The commission holds a public hearing at a location near the residential rental building at least thirty days prior to the conditional and final approval or denial of the submetering application.
(c) The applicant includes with the application:
(i) findings of a study commissioned by the applicant of the thermal characteristics of the building;
(ii) records of the last twenty-four months of electrical usage and charges;
(iii) the projected submetered rates at the current usage rate for the various dwelling unit types that exist in the building;
(iv) a plan to replace all non-energy star rated appliances provided by the applicant to the tenants with energy star rated appliances.
(d) The applicant pays all costs of an independent energy analysis of the building by one of the consultants chosen by the tenants if a group of at least fifty percent of the tenants of record request such analysis and the group of tenants provides to the applicant at least three bids from consultants who can perform such analysis.
2. (a) All applications filed pursuant to the provisions of this section shall be subject to a two-tiered approval process by the commission. Initial approval of an application, if granted by the commission, shall be granted for a period of one year, at which time, the approval shall automatically expire; provided that, within three months prior or subsequent to the expiration of the grant of conditional approval, the applicant may file for review of the application for the purpose of obtaining final approval of the application. Any applicant filing for review for final approval of an application shall submit to the commission a listing of the actual metered usage rates and charges to the tenants during the period of the conditional approval of the application.
(b) Any applicant whose application for conditional approval is denied by the commission may re-file an application no earlier than six months following the denial of the application by the commission.
(c) The commission shall provide written notice to an applicant of its decision regarding applications within thirty days of the public hearing required by subdivision one of this section. All denials of applications
A. 4041 3
shall state the reasons for the denial, shall specify the measures the applicant must take to qualify for approval of the application and shall advise the applicant of his or her right to investigation and review of the denial of the application if the applicant considers such denial to be without justification.
§ 2. The public service commission shall promulgate any rules and regulations necessary for the implementation of this act on its effective date.
§ 3. This act shall take effect immediately.
Reflowed for reading: line numbers and page breaks removed. Cite the official text.
Summaries, headlines and scores are AI-generated from the official bill text. How we score bills. Source: NYS Open Legislation.