This bill requires utilities to create climate resilience plans and studies, and mandates customer compensation for prolonged power outages.
Why it matters
Mandates long-term planning and accountability. Utilities must conduct climate vulnerability studies and develop 10- and 20-year climate resilience plans, which must be regularly updated, publicly reviewed, and approved by regulators. This ensures that utilities are taking a proactive, transparent approach to adapt infrastructure for increasingly severe weather events.
Direct financial impacts on utilities and customers. Utilities will be required to invest in storm hardening and resilience measures, funded through a separate charge on customer bills (with oversight to prevent double billing). However, the costs of compensating customers for prolonged outages cannot be passed on to ratepayers, holding utilities financially accountable for service failures.
Concrete customer protections and compensation. The bill establishes automatic credits and reimbursements for residential and small business customers who experience lengthy power outages, including compensation for spoiled food and prescription medication, providing direct relief for hardships caused by utility service interruptions.
Increased public and stakeholder participation. Utilities must work with local governments, advocacy groups, and a newly established climate resilience working group, and hold public forums on resilience plans. This inclusion aims to ensure that community voices and equity concerns are considered in how utilities prepare for climate risks and invest in infrastructure.
Albany, before your first meeting.
Every bill that moved yesterday, summarized in a sentence and ranked by impact. The Albany Scorecard follows on Sundays.
Free. Unsubscribe in one click. Want alerts on specific bills? Create an account.
Headline styles
Storm Prep, Outage Payback
Plain English, a few words. Used as the page title.
Sponsors
Senator · Senate District 14
1 Co-sponsor
History
- Approval memo.141
- Signed chap.786
- Delivered to governor
- Returned to senate
- Passed assembly
- Ordered to third reading cal.170
- Substituted for A3360A
- Referred to codes
- Delivered to assembly
- Passed senateVote 48–15
- Ordered to third reading cal.1777
- Committee discharged and committed to rules
Show 3 earlier actions
- Print number 4824a
- Amend (t) and recommit to energy and telecommunications
- Referred to energy and telecommunications
Companion bill
The same bill in the other chamber. A bill becomes law when one version passes both houses and the governor signs it, so either number can carry it.
Protect Power, Refund Outages
Assembly Floor Calendar · Sponsor Amy Paulin
Full text
6 pagesUnderlined is new[Struck] is removedOfficial text on nysenate.gov ↗
STATE OF NEW YORK
4824--A
2021-2022 Regular Sessions
IN SENATE
February 12, 2021
Introduced by Sen. COMRIE -- read twice and ordered printed, and when printed to be committed to the Committee on Energy and Telecommunications -- committee discharged, bill amended, ordered reprinted as amended and recommitted to said committee
AN ACT to amend the public service law, in relation to storm hardening and system resiliency plans (Part A); and to amend the public service law, in relation to providing rate payers with reimbursement following prolonged power outages (Part B)
The People of the State of New York, represented in Senate and Assembly, do enact as follows:
Section 1. Each component of this act is wholly contained within a part identified parts A and B. The effective date for each particular provision contained within such part is set forth in the last section of such part. Any provision in any section contained within a part, including the effective date of the part, which makes reference to a section "of this act", when used in connection with that particular component, shall be deemed to mean and refer to the corresponding section of the part in which it is found. Section three of this act sets forth the general effective date of this act.
PART A
Section 1. Legislative findings. 1. The Legislature hereby finds and declares that, due to the rise in storm intensity, and effects of climate change, dedicated storm hardening programs need to be developed and implemented throughout New York State to reduce damage and costs from future weather events, as well as facilitate prompt restoration times. Storm hardening is the process of constructing new, or upgrading old, infrastructure to increase resiliency and overall reliability during weather events. In 2018, Winter Storm Riley and Winter Storm Quinn greatly impacted New York's electric distribution system with
EXPLANATION--Matter in italics (underscored) is new; matter in brackets
[ ] is old law to be omitted.
LBD08931-11-1
S. 4824--A 2
nearly 500,000 customers losing power. In August 2020, Tropical Storm Isaias brought high winds, downed trees and widespread power outages to much of the state; hundreds of thousands of customers in Long Island, New York City, Westchester and Rockland counties experienced extensive power outages, some lasting for more than a week. Legislative hearings following these storms made it clear that enhanced storm hardening efforts are needed to mitigate some of the impacts to the distribution infrastructure and customers;
2. It is in the state's interest to strengthen electric utility infrastructure to withstand extreme weather conditions, and the effects of climate change by promoting the hardening of electrical transmission and distribution facilities, the undergrounding of certain electrical distribution lines, and enhanced vegetation management, including the removal of danger trees, as well as long term planning;
3. Protecting and strengthening transmission and distribution electrical utility infrastructure from extreme weather conditions, and the effect of climate change, can effectively reduce restoration costs and outage times to customers and improve overall service reliability for customers;
4. It is in the state's interest for each utility to mitigate restoration costs and outage times to utility customers when developing transmission and distribution storm protection plans; and
5. All customers benefit from the reduced costs of storm restoration.
§ 2. Section 66 of the public service law is amended by adding a new subdivision 29 to read as follows:
29. (a) Each electric corporation subject to section twenty-five-a of this chapter shall prepare and submit a climate change vulnerability study to the commission within eighteen months of the effective date of this act. The commission shall provide such study to the governor and the legislature. The climate change vulnerability study shall evaluate the electric corporation's infrastructure, design specifications, and procedures to better understand the corporation's vulnerability to climate-driven risks, and shall include, but not be limited to, adaptation measures to address vulnerabilities and any other information deemed necessary by the commission.
(b) Within sixty days from submission of a climate change vulnerability study to the commission, each electric corporation subject to section twenty-five-a of this chapter shall, pursuant to regulation by the commission, submit a climate resilience plan to the commission for review and approval. Each plan shall: (i) propose storm hardening and resiliency measures for the next ten years and twenty years, and shall explain the systematic approach the corporation will follow to achieve the objectives of mitigating the impacts of climate change to utility infrastructure, reducing restoration costs and outage times associated with extreme weather events, and enhancing reliability, as well as such other additional objectives the commission may require consistent with ensuring increased resiliency of utility infrastructure and overall reliability during extreme weather events; (ii) detail how the corporation will incorporate climate change into its planning, design, operations, and emergency response; (iii) incorporate climate change into existing processes and practices, manage climate change risks and build resilience; and (iv) propose adjustments, as necessary, to how the corporation plans and designs infrastructure for the increasing impacts from climate change. The commission shall adopt rules to specify any additional elements that must be included in a corporation's filing for review of climate resilience plans.
S. 4824--A 3
(c) Each subject electric corporation shall contemporaneously serve the climate resilience plan on the parties from its last rate case filed pursuant to subdivision twelve of this section.
(d) In its review of each climate resilience plan filed pursuant to this subdivision, the commission shall, at minimum, consider:
(i) the extent to which the plan is expected to mitigate the impacts of climate change, reduce restoration costs and outage times associated with extreme weather events, and enhance reliability, including whether the plan examines areas of lower reliability performance;
(ii) the extent to which storm protection and hardening of transmission and distribution infrastructure is feasible, reasonable, or practical in certain areas of the corporation's service territory, including, but not limited to, coastal areas, flood zones, and rural areas;
(iii) the estimated costs and benefits to the corporation and its customers of making the improvements proposed in the plan, including considerations of equity in the plan as applied across the entire service territory, with particular attention paid to the costs and benefits in undergrounding transmission and distribution lines;
(iv) the timeline for implementation of the plan;
(v) whether the plan includes major performance benchmarks that measure the effectiveness of the implementation of the plan;
(vi) the estimated annual rate impact resulting from implementation of the plan during the first five years addressed in the plan;
(vii) the extent to which the plan considers a multi-pronged strategy appropriately tailored to addressing the impacts of climate change, reducing restoration costs and outage times and enhancing infrastructure reliability, including, but not limited to, vegetation management, improvements to system management practices, undergrounding of distribution and transmission lines, replacement of obsolete cables, wires and poles, automation and circuit reconfiguration, investing in infrastructure that supports the development of technologies that would improve response to extreme weather events and reduce restoration costs, and system resiliency through the deployment of distributed energy resources, and fortifying critical facilities;
(viii) the extent to which the plan identifies opportunities for coordination with municipalities, customer advocate groups, the independent system operator, the energy research and development authority, and other utility or telecommunication service providers; and,
(ix) the recommendations from the utility climate resilience working group established pursuant to paragraph (h) of this subdivision.
(e) No later than eleven months after a corporation files a climate resilience plan that contains all of the elements required by this subdivision, and after a public hearing on the plan, which shall include a public forum at a physical location, attended by commission members or their designees to take in written or oral comment, the commission shall determine whether it is in the public interest to approve or modify the plan.
(f) At least every five years after approval of a corporation's climate resilience plan, the corporation must file for commission review an updated plan that addresses each element specified by commission regulation. The commission shall approve, modify, or deny each updated plan pursuant to the criteria used to review the initial plan.
(g) Each corporation shall make an annual filing to recover the corporation's climate resilience plan costs through a charge separate and apart from its base rates, to be referred to as the climate resilience
S. 4824--A 4
plan cost recovery clause. If the commission determines that such costs are just and reasonable, in the public interest, and were prudently incurred, those costs will not be subject to disallowance or further reasonableness or prudence review except for fraud, perjury, or intentional withholding of key information by the corporation, or if the commission finds that the corporation has imprudently implemented the plan. The annual climate resilience plan costs may not include costs recovered through the corporation's base rates and must be allocated to customer classes pursuant to the rate design most recently approved by the commission. If a capital expenditure is recoverable as a climate resilience plan cost, the corporation may recover the annual depreciation on the cost, calculated at the corporation's current approved depreciation rates, and a return on the undepreciated balance of the costs calculated at the corporation's weighted average cost of capital using the last approved return on equity.
(h) Each corporation shall establish a utility climate resilience working group no later than one year after the effective date of this subdivision. Such working group shall advise and make recommendations to the corporation and the commission on the development and implementation of the corporation's climate resilience plan. The working group shall be comprised of representatives from the department, and municipal representatives, customer advocacy groups, and energy and environmental advocacy organizations. The working group shall meet at least twice annually.
(i) Each corporation shall provide to the county executive or the chief elected official of a county for each county within its service territory the most recent approved copy of the climate resilience plan required pursuant to this subdivision. For the purposes of an electric corporation operating within the city of New York, such corporation shall provide the most recent approved climate resilience plan with both the mayor's office and emergency management office of the city of New York.
(j) The commission shall provide access to such climate resilience plans pursuant to article six of the public officers law.
(k) Beginning December first of the year after the first full year of implementation of a climate resilience plan and annually thereafter, the commission shall submit to the governor and the legislature a report on the status of each corporation's activities to comply with the plan. The report shall include, but is not limited to, identification of all storm protection and resiliency activities completed or planned for completion, the actual costs and rate impacts associated with completed activities as compared to the estimated costs and rate impacts for those activities, the estimated costs and rate impacts associated with activities planned for completion, and the governance, planning, and operational activities undertaken by the corporation in furtherance of the climate resilience plan.
(l) The commission shall promulgate any necessary rules and regulations to implement and administer the provisions of this subdivision.
§ 3. This act shall take effect on the ninetieth day after it shall have become a law. Effective immediately, the promulgation of any rules or regulations by the Public Service Commission necessary for the implementation of this act on its effective date are authorized to be made and completed on or before such effective date.
PART B
S. 4824--A 5
Section 1. The public service law is amended by adding a new section 73 to read as follows:
§ 73. Compensation to customers experiencing widespread prolonged outages. 1. Notwithstanding any other provision of law, in the event that a residential utility customer or a small business customer experiences a widespread prolonged outage lasting at least seventy-two consecutive hours or more without having been resolved by the utility company, the utility company shall:
(a) Provide a credit of twenty-five dollars on the balance of such residential utility customer's account for each subsequent twenty-four hour period of service outage that occurs for such customers for more than seventy-two consecutive hours after the occurrence of such widespread prolonged outage.
Reflowed for reading: line numbers and page breaks removed. Cite the official text.
Sponsor's memo
Title of bill
An act to amend the public service law, in relation to storm hardening and system resiliency plans (Part A); and to amend the public service law, in relation to providing rate payers with reimbursement following prolonged power outages (Part B)
Purpose or general idea of bill
The purpose of this bill is twofold: to provide meaningful, defined compensation to customers of gas and electric corporations experiencing prolonged service outages and to require the submission of detailed, forward-thinking climate change vulnerability study by utilities.
Summary of provisions
Part A amends the Public Service Law to require every combination gas and electrical utility corporation regulated by the Public Service Commission (PSC) to submit a climate change vulnerability study that covers a manifest number of things to the PSC. Each plan shall explain the approach the corporation will follow to achieve mitigate restoration costs and reduce outage times associated with extreme weather events and enhancing reliability. The PSC shall adopt rules to specify the elements that must be included in a corporation's plan, and either approve or modify said plan based on statutory criteria, such as the estimated annual rate impact resulting from plan implementation. Each corporation must file an updated storm plan with the PSC for approval at least every 5 years. Each corporation must file their most recently approved plan with each county in their respective service territories. The costs for implementing the plan may be recovered separately from such corpo- ration's base rates as a separate annual charge, subject to approval by the PSC in an annual proceeding if the PSC determines such costs are fair, reasonable, and prudent.
Read the full memo (811 words)
Part B of the bill would amend the public service law by adding a new section 73 that would require gas and electric corporations to provide residential customers: 1) with a credit of $25 on the balance of their bill for each twenty-four hour period of service outage that occurs for more than 72 consecutive hours after an emergency event; and 2) with a reimbursement for any medication and food that expires or spoils due to a service outage that lasts longer than 72 consecutive hours after an emergency event as well as extending all protections to small business for food spoilage. Any costs incurred by the electric or gas corporation in compliance with this section shall not be recoverable from ratepay- ers.
Justification
When Tropical Storm Isaias tore through New York in August of 2020; it left behind a wake of downed trees and power lines resulting in hundreds of thousands of customers without power. A state of emergency was declared in Bronx, Duchess, Kings, Nassau, New York, Orange, Putnam, Queens, Richmond, Rockland, Suffolk and Westchester counties. Yet, more than a week later, 35,000 customers in the state were still without power. Delayed restoration efforts caused a significant disruption to
customer's daily routines, combined with the financial loss of spoiled food and medication.
It was later determined that inadequate storm preparations by some util- ity companies and breakdowns in communication systems played a role in the delayed restoration times. This bill puts rate payers first in the event of prolonged service outage providing compensation via customer's accounts. Simply put, if utilities fall short restoring service, custom- ers now have recourse.
Similarly, due to the rise in storm intensity, dedicated storm hardening programs need to be developed and implemented by electric utility compa- nies throughout the State to reduce damage, restorations times, and costs from future weather events. Storm hardening is the process of constructing new, or upgrading old, infrastructure to increase resilien- cy and overall reliability of service during weather events. In 2018, Winter Storm Riley and Winter Storm Quinn greatly impacted New York's electrical distribution system with nearly 500,000 customers losing power. An investigation by the Department of Public Service :recom- mended New York's major electrical utilities create and implement storm hardening and system resiliency plans by July 2019; however, the Public Service Commission has been unduly slow in their approval of submitted plan. In August 2020, Tropical Storm Isaias brought high winds, downed trees and widespread outages to much of the state; hundreds of thousands of customers in Long Island, New York City, Westchester and Rockland counties experienced prolonged outages, some lasting more than a week. Legislative hearings following these storms made it clear that storm hardening efforts are needed to mitigate some of the impacts to the distribution infrastructure and customers. By requiring electrical util- ities to adopt and implement such hardening and resiliency plans and the Public Service Commission to approve such plans within a fixed timeline, New Yorkers will be better prepared to endure and recover from future extreme weather events.
Prior legislative history
New bill. A Print has elements of S.4861 and S.4824.
Fiscal implications for state and local governments
None to the state.
Effective date
Immediate.