Require Recycling at Construction Sites

Official title

“Requires contractors in certain large cities to recycle 50% of the waste generated on construction and demolition sites”

Sponsor William ColtonAD-47+14 co-sponsorsAffects Finance
Status
In Assembly Committee
Ways And Means
Impact
7/10
Significant
Passage
0%

Bill progress

Step 2 of 7

In committee · Ways And Means

What's happening

This bill requires contractors in New York City to recycle or reuse a set percentage of construction and demolition waste, with fines for noncompliance.

Why it matters

  1. Targets large-scale construction and demolition projects. in New York City, focusing specifically on projects that create significant waste—like large residential or commercial buildings and major rehabs—while exempting smaller projects and those only needing plumbing or electrical permits.

  2. Imposes escalating recycling/reuse requirements over time. , starting at 25% of debris (by weight) within the first year and increasing to 50% for projects permitted after the first year, driving a substantial reduction in landfill-bound waste and encouraging the construction industry to adapt to more sustainable practices.

  3. Links compliance to critical project milestones. by withholding building/demolition permits and certificates of occupancy from contractors who don’t submit required documentation or pay fines, making recycling and reporting an unavoidable part of doing business in the city.

  4. Creates accountability and flexibility. by establishing a formal waiver process for cases where recycling/reuse is genuinely unfeasible, while also imposing significant daily and percentage-based fines for noncompliance—giving the city the tools to enforce the law but also recognize legitimate exceptions.

The daily · weekday mornings

Albany, before your first meeting.

Every bill that moved yesterday, summarized in a sentence and ranked by impact. The Albany Scorecard follows on Sundays.

Free. Unsubscribe in one click. Want alerts on specific bills? Create an account.

Who cares

  • General contractors and demolition subcontractors

    On covered projects in cities with at least one million residents, they would have to recycle or reuse 25% of debris by weight initially and 50% for projects with permit applications dated a year or more after the effective date, with fines for noncompliance.

  • City buildings departments

    They would oversee compliance documentation and waivers, block new permits for contractors with overdue documentation, and have authority to audit contractors and withhold certificates of occupancy.

  • Property owners and developers

    Covered projects could face withheld certificates of occupancy, and owners could seek waivers if contractors are unavailable or refuse to provide required documentation.

  • Permitted recycling facilities and transfer stations

    The recycling and reuse requirements would direct debris from covered construction and demolition projects away from disposal.

Headline styles

Require Recycling at Construction Sites

Plain English, a few words. Used as the page title.

Sponsors

History

  1. Referred to ways and means
  2. Reported referred to ways and means
  3. Reported referred to codes
  4. Referred to environmental conservation

Companion bill

The same bill in the other chamber. A bill becomes law when one version passes both houses and the governor signs it, so either number can carry it.

S4720Senate

Require Construction Waste Recycling

In Senate Committee · Cities 1 · Sponsor James Sanders Jr.

Impact 7 · Significant0% to pass

Full text

3 pagesUnderlined is new[Struck] is removedOfficial text on nysenate.gov ↗

STATE OF NEW YORK

1836

2023-2024 Regular Sessions

IN ASSEMBLY

January 23, 2023

Introduced by M. of A. COLTON, DINOWITZ, L. ROSENTHAL, CARROLL, OTIS, SEAWRIGHT, WILLIAMS, SIMON, RIVERA, COOK, EPSTEIN, SAYEGH, DICKENS, KELLES -- Multi-Sponsored by -- M. of A. GLICK, HYNDMAN, LUPARDO, MILLER -- read once and referred to the Committee on Environmental Conservation

AN ACT to amend the general city law, in relation to requiring contractors in certain cities to recycle construction and demolition site waste

The People of the State of New York, represented in Senate and Assembly, do enact as follows:

Section 1. Legislative intent. The purpose of this act is to significantly reduce the amount of waste produced by construction and demolition activities in cities having populations of one million or more. There are many opportunities to reduce or recycle materials from construction and demolition, including metals, cardboard, drywall, glass, wood and asphalt. This act is consistent with the goals of large cities' solid waste management plans, complementing other recycling and recovery programs currently in effect.

§ 2. The general city law is amended by adding a new section 23-a to read as follows:

§ 23-a. Construction and demolition site waste recycling; certain cities. 1. Definitions. As used in this section:

a. "Contractor" means a general contractor and shall also include any subcontractor engaged in the demolition or wrecking of a structure for which a permit is required.

b. "Construction and demolition debris" shall include, but not be limited to, metals, cardboard, drywall, glass, wood, concrete, brick and asphalt, but shall not include any material that is contaminated by lead, asbestos or any other hazardous material such that recycling thereof would be illegal or unfeasible.

EXPLANATION--Matter in italics (underscored) is new; matter in brackets

[ ] is old law to be omitted.

LBD05186-01-3

c. "Recycler" means a recycling facility, transfer station or other solid waste management facility permitted pursuant to the environmental conservation law.

d. "Reuse" means (i) the on-site use of reprocessed construction and demolition debris if the use of such debris is authorized by the city department of buildings; and (ii) the off-site redistribution of a material which would otherwise be disposed of, for use in the same or similar form as it was produced.

2. Applicability. a. The provisions of this section shall apply only in cities having a population of one million or more.

b. Contractors shall recycle or reuse construction and demolition debris produced on site as part of construction or demolition activities by meeting the following requirements:

(1) on a project that is issued a permit with an application date within one year of the effective date of this section, the contractor shall cause to be recycled or reused at least twenty-five percent of the construction and demolition debris, as measured by weight, produced on site.

(2) on a project that is issued a permit with an application date a year or more after the effective date of this section, the contractor shall cause to be recycled or reused at least fifty percent of the construction and demolition debris, as measured by weight, produced on site.

c. The following projects shall be subject to the provisions of this section:

(1) Construction of new residential buildings with four or more dwelling units;

(2) Construction of new non-residential buildings, other than projects for which the total area is four thousand square feet or less;

(3) Any rehabilitation of non-residential buildings of more than four thousand square feet that will require a certificate of occupancy to be issued from the city;

(4) Demolition of residential buildings with four or more dwelling units that includes the demolition of at least one outside wall; and

(5) Demolition of non-residential buildings, other than projects for which the total area is four thousand square feet or less.

d. A project shall be exempt from the provisions of this section if only a plumbing permit or only an electrical permit is required for such project.

3. Contractor responsibilities. a. Within thirty days of completion of a project, the contractor shall submit documentation to report compliance with this section and the regulations promulgated pursuant to this section. If the contractor is unable to meet the recycling and reuse requirements of this section, the contractor may apply for a waiver from the city. Such documentation shall be in a form and manner determined by the city department of buildings.

b. If a contractor is unable or refuses to submit the required documentation, a property owner may submit a waiver application supported by an affidavit that the contractor is unavailable or refuses to provide the required documentation.

c. A contractor shall comply with all reasonable requests for information and documentation by the city department of buildings pursuant to an audit to monitor compliance with this section. Documentation required by this section shall be maintained for at least three years.

4. City responsibilities. a. The city shall establish a procedure for contractors to apply for waivers of the requirements of this section. Such requirements shall include documentation of the amount of material the contractor is actually able to recycle or reuse and the reason or reasons for which the contractor cannot meet the recycling and reuse requirements in this section.

b. The city shall not issue any new building or demolition permit to a contractor who has failed to timely submit the required documentation with respect to any completed project, until such contractor either submits (1) the required documents including, where applicable, proof that any fine due pursuant to subdivision five of this section has been paid in full, or (2) proof of a waiver issued by the city and, the payment of any fine due.

c. The city may withhold a certificate of occupancy for a project until the contractor submits either the required documentation including, where applicable, proof that any fine due pursuant to subdivision five of this section has been paid in full; or proof of a waiver issued by the city and, the payment of any fine due.

d. The city is authorized to conduct audits of contractors to determine and validate compliance with the requirements of this section. The city may request information and documentation relevant to such an audit from any contractor.

e. The city is authorized to promulgate such rules and regulations as necessary to implement the provisions of this section. Such rules and regulations shall contain provisions for seeking and obtaining a waiver from the provisions of this section.

5. Fines and penalties. a. Contractors who fail to provide the documentation required by this section or who have not received a waiver from the city shall be subject to a fine of five hundred dollars for each day that they fail to provide the information or apply for a waiver.

b. Contractors who fail to meet the recycling or reuse requirements of this section and have applied for and not received a waiver from the city shall be assessed a fine as follows:

(1) for projects involving ten thousand square feet or more of renovated, newly constructed or demolished space, five hundred dollars for each percentage point of difference between the amount required by this section to be recycled or reused and the amount actually recycled or reused; and

(2) for projects involving less than ten thousand square feet of renovated, newly constructed or demolished space, two hundred fifty dollars for each percentage point of difference between the amount required by this section to be recycled or reused and the amount actually recycled or reused.

c. The city may modify the penalties required by paragraph a or b of this subdivision for failure to provide documentation or meet the recycling and reuse requirements, if it finds that there are extenuating circumstances for such failures.

§ 3. This act shall take effect on the first of January next succeeding the date on which it shall have become a law.