What's happening
This bill requires New York State to regularly evaluate and plan for the deployment of electric vehicle charging infrastructure on highways and at fleet depots to support zero-emission transportation goals.
Why it matters
Strategic planning for charging infrastructure. The bill mandates a recurring, comprehensive assessment of where and how much electric vehicle (EV) charging infrastructure is needed, including fast chargers on highways and at key fleet depots. This means the state will proactively identify gaps, anticipate demand, and align upgrades with evolving transportation and environmental goals.
Focus on all vehicle types and equity. The evaluation isn’t just for passenger cars—it specifically includes medium- and heavy-duty vehicles like trucks, buses, and commercial fleets, as well as public fleets (e.g., school buses). The law also requires attention to disadvantaged and environmental justice communities, aiming to ensure statewide, equitable access to charging.
Integration with grid and funding planning. By requiring estimates of necessary electric grid upgrades and identifying funding opportunities (federal, state, etc.), the bill aims to minimize costs for utilities and ratepayers while supporting a smooth transition to EVs. This integrated approach could reduce bottlenecks and financial burdens as the state electrifies transport.
Transparency and stakeholder engagement. The law requires that findings be published online and that a stakeholder process be developed—including public input and targeted outreach to affected groups such as fleet operators, manufacturers, and local communities. This increases public oversight and helps ensure the infrastructure meets real-world needs.
Albany, before your first meeting.
Every bill that moved yesterday, summarized in a sentence and ranked by impact. The Albany Scorecard follows on Sundays.
Free. Unsubscribe in one click. Want alerts on specific bills? Create an account.
Headline styles
Study EV Charging Needs
Plain English, a few words. Used as the page title.
Sponsors
21 Co-sponsors
- John T. McDonald III
- Aileen Gunther
- Albert A. Stirpe
- Pamela J. Hunter
- Fred Thiele
- Deborah Glick
- Steve Stern
- Jonathan Jacobson
- William Magnarelli
- Scott H. Bendett
- Keith Brown
- Brian Cunningham
- Patricia Fahy
- Michael Durso
- Jerett Gandolfo
- Steven Otis
- William Colton
- Linda Rosenthal
- Tony Simone
- Michael Novakhov
- Matthew Simpson
1 Multi-sponsor
History
- Tabled
- Vetoed memo.52
- Delivered to governor
- Returned to assembly
- Passed senateVote 59–3
- 3rd reading cal.1746
- Substituted for S4830C
- Referred to rules
- Delivered to senate
- Passed assembly
- Ordered to third reading rules cal.505
- Rules report cal.505
Show 10 earlier actions
- Reported
- Reported referred to rules
- Print number 5052c
- Amend and recommit to ways and means
- Print number 5052b
- Amend and recommit to ways and means
- Reported referred to ways and means
- Print number 5052a
- Amend (t) and recommit to corporations, authorities and commissions
- Referred to corporations, authorities and commissions
Companion bill
The same bill in the other chamber. A bill becomes law when one version passes both houses and the governor signs it, so either number can carry it.
Evaluate Charging Station Needs
Senate Floor Calendar · Sponsor Timothy M. Kennedy
Full text
5 pagesUnderlined is new[Struck] is removedOfficial text on nysenate.gov ↗
STATE OF NEW YORK
5052--C
2023-2024 Regular Sessions
IN ASSEMBLY
February 27, 2023
Introduced by M. of A. WOERNER, McDONALD, GUNTHER, STIRPE, HUNTER, THIELE, GLICK, STERN, JACOBSON, MAGNARELLI, BENDETT, K. BROWN, CUNNINGHAM, FAHY, DURSO, GANDOLFO -- Multi-Sponsored by -- M. of A. SIMON -- read once and referred to the Committee on… Show allHide
Introduced by M. of A. WOERNER, McDONALD, GUNTHER, STIRPE, HUNTER, THIELE, GLICK, STERN, JACOBSON, MAGNARELLI, BENDETT, K. BROWN, CUNNINGHAM, FAHY, DURSO, GANDOLFO -- Multi-Sponsored by -- M. of A. SIMON -- read once and referred to the Committee on Corporations, Authorities and Commissions -- committee discharged, bill amended, ordered reprinted as amended and recommitted to said committee -reported and referred to the Committee on Ways and Means -- committee discharged, bill amended, ordered reprinted as amended and recommitted to said committee -- again reported from said committee with amendments, ordered reprinted as amended and recommitted to said committee
AN ACT to amend the public authorities law, in relation to conducting a highway and depot charging needs evaluation
The People of the State of New York, represented in Senate and Assembly, do enact as follows:
Section 1. Legislative findings. In order to achieve targets set forth by the climate leadership and community protection act, zero-emissions vehicle sales target and regulations, including the advanced clean truck and advanced clean cars II rules, zero-emissions school bus mandate, and other relevant goals, the interests of the people of the state would be served by:
1. Coordinating efforts to plan for electric vehicle fast-charging deployment on New York's highways;
2. Identifying priority sites for the deployment of fast chargers along New York's highways, estimating future charging demand at these sites for all vehicle classes, and identifying necessary electric grid transmission and distribution infrastructure and interconnection upgrades at these sites;
3. Expediting electric grid transmission and distribution infrastructure and interconnection upgrades at sites controlled by the New York state thruway authority, sufficient to future-proof thruway sites for
EXPLANATION--Matter in italics (underscored) is new; matter in brackets
[ ] is old law to be omitted.
LBD09078-09-3
accelerated fast charger deployment to serve light duty, medium duty and heavy duty vehicles; and
4. Identifying additional high priority areas for the deployment of charging for medium and heavy duty vehicles, such as school buses, transit buses, and other light, medium and heavy duty commercial fleet depots, including taxi and ride-share vehicle fleets, and removing barriers to charging deployment, including electric infrastructure constraints.
5. Identifying additional priority areas for deployment of charging infrastructure designed to support building of charging in densely populated urban areas where access to charging is currently or may be limited.
§ 2. The public authorities law is amended by adding a new section 1885 to read as follows:
§ 1885. Highway and depot charging needs evaluation. 1. Within nine months of the effective date of this section, and every three years thereafter, the authority, in consultation with the department of transportation, the department of motor vehicles, the New York state thruway authority, the New York power authority, the Long Island power authority, the department of environmental conservation, the electric distribution and local transmission utilities, the New York Association for Pupil Transportation, and freight logistics experts shall conduct a needs evaluation to:
(a) consider planning by the department of transportation for fast charger deployment along alternative fuel corridors and major freight corridors;
(b) identify the number and location of fast chargers along priority highway corridors and major freight corridors, including fast chargers currently in operation and in development;
(c) estimate future need for fast charger deployment along priority highway and major freight corridors for the purposes of (i) facilitating the cost-effective and timely achievement of mandates under (1) article seventy-five of the environmental conservation law, (2) section 19-0306-b of the environmental conservation law regarding zero-emissions vehicle sales targets, (3) rules and regulations for zero-emissions vehicles adopted by the commissioner of environmental conservation, and (4) other relevant and applicable federal and state rules or regulations or local goals to reduce transportation sector emissions; and (ii) supporting electric vehicle adoption by consumers and fleet operators;
(d) identify the number and location of highway charging hubs, including but not limited to thruway charging hubs and freight charging hubs, currently in operation and in development along priority highway and major freight corridors;
(e) estimate total charging capacity required to serve light duty, medium duty, and heavy duty electric vehicles at each highway and freight charging hub through at least the year two thousand fifty;
(f) identify, to the extent practicable, the number and location of commercial and public fleet vehicles in operation, including their body type, fuel type, model year, zip code, and other relevant information needed to forecast the number and location of zero-emissions vehicles, per state policy;
(g) identify the number and location of fleet charging zones;
(h) estimate future need for charging deployment and charging capacity in the fleet charging zones, sufficient to satisfy the targets and regulations identified in paragraph (c) of this subdivision;
(i) examine ways to optimize fast charger deployment among the highway charging hubs, the freight charging hubs, and all such charging hubs, and charging development among the fleet charging zones to reduce the cost of interconnection, if deemed necessary, and electric distribution and local transmission upgrades while serving projected vehicle traffic volumes;
(j) analyze and asses the total potential costs associated with any identified need;
(k) analyze and assess federal or state funding opportunities to minimize such costs to rate payers; and
(l) identify the number and location of critical public charging sites and estimate future need for charging deployment and charging capacity for critical public charging sites.
2. The authority shall develop a stakeholder engagement process to raise consumer awareness and education across the state and solicit feedback from the public, local government, representatives or residents of environmental justice or disadvantaged communities, electric vehicle manufacturers, electric vehicle supply equipment manufacturers, fleet operators, school district transportation directors and others on the highway and depot charging needs evaluation. To the extent practicable and consistent with applicable timelines, the authority may coordinate the highway and depot charging needs evaluation stakeholder input process with the process set forth in section eighteen hundred eighty-four of this article.
3. The needs evaluation shall be made publicly available on the authority's website.
4. When conducting the needs evaluation, the following locations shall be considered for designation as highway and/or freight charging hubs:
(a) All thruway charging hubs.
(b) Additional sites or geographic areas based on (i) eligibility for federal, state, or other funding opportunities, including but not limited to needs identified through the NEVI formula program planning process, (ii) proximity to electric transmission infrastructure, (iii) projected vehicle traffic, (iv) charging network coverage, (v) interstate and intrastate commerce, (vi) benefits to environmental justice and disadvantaged communities, (vii) benefits of increased charging accessibility in host communities, (viii) real property ownership or control of potential sites, (ix) relevant commitments from site and/or charging operators, and (x) other factors deemed relevant for the development and successful implementation of the highway charging needs evaluation.
(c) Locations within one mile of the priority highway corridors, spaced no more than fifty miles apart along the priority highway corridors and reasonably accessible regardless of direction of travel.
(d) Privately operated sites which are open to the public or multiple commercial entities as eligible for designation as a highway charging hub or freight charging hub, subject to reasonable restrictions.
(e) A single highway or freight charging hub comprised of multiple charging service areas within a reasonable distance from one another.
5. When conducting the needs evaluation, the following geographic area criteria shall be considered when determining designations as fleet charging zones:
(a) total number of commercial and public fleet vehicles in operation and/or total number of fleet operators in the geographic area,
(b) projected vehicle traffic in the geographic area,
(c) benefits to public fleets, such as school bus operators,
(d) benefits to environmental justice and disadvantaged communities,
(e) relevant commitments from fleet and/or site operators to install charging equipment,
(f) available capacity on the electric distribution and local transmission network to serve vehicle chargers,
(g) ensuring equitable coverage and access to fleet charging throughout the state, and
(h) sites where private or public fleet vehicles are regularly parked, maintained, or otherwise dispatched for service, including school bus garages.
6. As used in this section, the following terms shall have the following meanings:
(a) "Alternative fuel corridors" shall mean highways designated within the state pursuant to the national electric vehicle infrastructure formula program under 23 U.S.C. 151 and previously designated under the federal Fixing America's Surface Transportation Act of 2015.
(b) "Charging needs evaluation" shall mean the highway and depot charging needs evaluation.
(c) "Critical public charging site" shall mean a priority site for the deployment of charging infrastructure designed to support buildout of charging in densely populated urban areas where access to charging may be limited.
(d) "Fast charger" shall mean a direct current electric vehicle charging port which can charge at a level of at least one hundred fifty kilowatts.
(e) "Fleet charging zone" shall mean a priority geographic area for the deployment of charging infrastructure for public and commercial fleet operators or owners, including school bus fleets, taxi and rideshare vehicle fleets.
(f) "Freight charging hub" shall mean a priority site for the deployment of large scale, fast charging infrastructure, which has minimum station power capability at or above six hundred kilowatts and supports at least one hundred fifty kilowatts per port simultaneously across four ports for charging. These sites may include highway charging hubs.
(g) "Highway and depot charging needs evaluation" shall mean the needs evaluation developed pursuant to subdivision two of this section.
(h) "Highway charging hub" shall mean a priority site for the deployment of large scale, fast charging infrastructure, which has minimum station power capability at or above six hundred kilowatts and supports at least one hundred fifty kilowatts per port simultaneously across four ports for charging. These sites shall include but are not limited to thruway charging hubs.
(i) "Major freight corridor" shall mean segments of the freight transportation network identified by the federal highway administration that carry more than fifty million tons per year, including highway segments that carry at least eight thousand five hundred trucks per day, additional highway segments and parallel rail lines that together carry at least eight thousand five hundred truck, trailer-on-flatcar, and container-on-flatcar payloads of typically high-value, time sensitive cargo, and rail lines and waterways that carry fifty million tons in bulk cargo per year.
(j) "NEVI" shall mean the national electric vehicle infrastructure program established under the federal Infrastructure Investment and Jobs Act of 2021.
(k) "Priority highway corridor" shall mean alternative fuel corridors and other state and county highways identified in the charging needs evaluation as appropriate to ensure sufficient and equitable charging access throughout the state.
(l) "Thruway charging hubs" shall mean all highway service areas controlled, leased, owned, or operated by the New York state thruway authority.
§ 3. This act shall take effect immediately.