Skip to content
A7510Assembly2023-2024 Session

Require EV Charger Cutoff Switch

Official title

“Requires standards for the new construction of electric vehicle charging stations to require such stations to have an external cutoff switch”

Sponsor Christopher EachusAD-99
Status
In Assembly Committee
Governmental Operations
Impact
5/10
Moderate
Passage
0%

Bill progress

Step 2 of 7

In committee · Governmental Operations

What's happening

This bill requires all new residential electric vehicle charging stations in New York to have an external cutoff switch and clear safety labeling.

Why it matters

  1. Improves emergency response and safety. By requiring a red external cutoff switch and clear labeling, first responders (like firefighters) can quickly disable power to an EV charger in an emergency—potentially reducing fire or electrical hazards.

  2. Affects home sales and transfers. The requirements apply not only to new construction but also to any residence with a permanently installed EV charging station when the property is sold or transferred, meaning current homeowners may need to retrofit equipment to comply before a sale.

  3. Standardizes installation practices. Mandates that cutoff switches be accessible outside the house or garage and operable without special tools or keys, making it easier for anyone—including people unfamiliar with the property—to act quickly in a dangerous situation.

  4. Promotes consumer awareness. The required signage and brightly labeled sticker on the breaker box ensure residents and visitors are aware of how to disconnect power to the charger, helping prevent accidents and supporting safe usage.

The daily · weekday mornings

Albany, before your first meeting.

Every bill that moved yesterday, summarized in a sentence and ranked by impact. The Albany Scorecard follows on Sundays.

Free. Unsubscribe in one click. Want alerts on specific bills? Create an account.

Who cares

  • Homeowners with permanently installed EV chargers

    The bill would require an outdoor red cutoff switch, a sign directing users to the breaker box and a brightly labeled sticker beside the charger’s breaker for new construction and upon sale or transfer of the residence.

  • Residential EV charger installers

    Installation standards would require a hand-operated cutoff outside the house or garage that cuts all power to the vehicle without a key or unlocking the device.

  • Home sellers and buyers

    The requirements would also apply when a residence containing a permanently installed EV charging station is sold or transferred.

Headline styles

Require EV Charger Cutoff Switch

Plain English, a few words. Used as the page title.

Sponsors

Primary sponsor
Christopher Eachus

Assembly Member · Assembly District 99

No co-sponsors yet.

History

  1. Referred to governmental operations
  2. Print number 7510a
  3. Amend (t) and recommit to governmental operations
  4. Referred to governmental operations

Full text

1 pageUnderlined is new[Struck] is removedOfficial text on nysenate.gov ↗

STATE OF NEW YORK

7510--A

2023-2024 Regular Sessions

IN ASSEMBLY

May 25, 2023

Introduced by M. of A. EACHUS -- read once and referred to the Committee on Governmental Operations -- committee discharged, bill amended, ordered reprinted as amended and recommitted to said committee

AN ACT to amend the executive law, in relation to requiring standards for the new construction of electric vehicle charging stations to require such stations to have an external cutoff switch

The People of the State of New York, represented in Senate and Assembly, do enact as follows:

Section 1. Subdivision 20 of section 378 of the executive law, as renumbered by section 3 of part RR of chapter 56 of the laws of 2023, is renumbered subdivision 21 and a new subdivision 20 is added to read as follows:

20. Standards requiring new construction of permanently installed residential electric vehicle charging stations to include a red external cutoff switch, a sign with directions to the residence's breaker box, and a brightly labeled sticker placed on the residence's breaker box next to the switch that cuts power to the electric vehicle charging station. Such requirements shall also apply to the sale or transfer of a residence containing a permanently installed electric vehicle charging station. A cutoff switch shall be a hand-operated switch which is capable of cutting off all power and electricity to the vehicle without the need of a key or to unlock the device. For permanently installed residential electric vehicle charging stations, such cutoff switch shall be placed outside of the house or garage.

§ 2. This act shall take effect immediately.

EXPLANATION--Matter in italics (underscored) is new; matter in brackets

[ ] is old law to be omitted.

LBD11193-03-3

Reflowed for reading: line numbers and page breaks removed. Cite the official text.

Summaries, headlines and scores are AI-generated from the official bill text. How we score bills. Source: NYS Open Legislation.