What's happening
This bill requires most new buildings with off-street parking in New York to include electric vehicle charging stations and EV-ready parking spaces, with exceptions for affordable housing.
Why it matters
Significantly increases future EV infrastructure. By mandating a high percentage (often 100% in multi-unit residential buildings) of “EV-ready” parking spaces and a substantial minimum of actual charging stations in most new construction, the law aims to remove a key barrier to EV adoption: lack of accessible charging, especially for apartment dwellers and commercial tenants.
Elevates electrical standards and future readiness. The bill requires that parking spaces are not just physically available but are “EV-ready”—meaning they have the necessary wiring, amperage, and circuit components installed during construction. This future-proofs new buildings and avoids the higher costs and logistical challenges of retrofitting.
Creates flexibility but sets a strong baseline. Local building departments can grant waivers for hardship cases (such as utility limitations or geographic challenges), and municipalities can enact stricter requirements. This balances statewide consistency with local autonomy and practicality.
Affordable housing carve-out. By exempting affordable housing developments, the bill seeks to avoid increasing construction costs for projects serving low- and moderate-income residents, but this also means EV infrastructure may remain less accessible to these populations unless subsidized or addressed separately.
Albany, before your first meeting.
Every bill that moved yesterday, summarized in a sentence and ranked by impact. The Albany Scorecard follows on Sundays.
Free. Unsubscribe in one click. Want alerts on specific bills? Create an account.
Who cares
Residential developers
Covered new multifamily buildings with off-street parking would need all parking spaces to be EV-ready and at least 20% equipped with Level 2 chargers, while affordable housing would be exempt.
Commercial developers
Covered new buildings with 11 or more parking spaces would need at least 20% to be EV-ready, including at least 10% equipped with Level 2 or direct current fast chargers.
Local building departments
They could grant owners waivers for undue hardship tied to utility limitations or significant burdens resulting from a site's geographic location.
Electric vehicle drivers
Covered new construction would provide charging access or wiring for future charging, with clear signage identifying charging stations and EV-ready spaces.
Headline styles
Require EV Chargers in Construction
Plain English, a few words. Used as the page title.
Sponsors
History
- Approval memo.74
- Signed chap.643
- Delivered to governor
- Returned to senate
- Passed assembly
- Ordered to third reading rules cal.308
- Substituted for A3780E
- Referred to ways and means
- Delivered to assembly
- Passed senateVote 40–20
- Ordered to third reading cal.1626
- Committee discharged and committed to rules
Show 22 earlier actions
- Print number 1736e
- Amend and recommit to energy and telecommunications
- Print number 1736d
- Amend and recommit to energy and telecommunications
- Reported and committed to energy and telecommunications
- Referred to housing, construction and community development
- Returned to senate
- Died in assembly
- Referred to codes
- Delivered to assembly
- Passed senateVote 40–21
- Amended on third reading 1736c
- Advanced to third reading
- 2nd report cal.
- 1st report cal.1018
- Print number 1736b
- Amend (t) and recommit to finance
- Reported and committed to finance
- Print number 1736a
- Amend (t) and recommit to energy and telecommunications
- Reported and committed to energy and telecommunications
- Referred to housing, construction and community development
Companion bill
The same bill in the other chamber. A bill becomes law when one version passes both houses and the governor signs it, so either number can carry it.
Require EV Chargers in New Buildings
Assembly Floor Calendar · Sponsor Patricia Fahy
Full text
4 pagesUnderlined is new[Struck] is removedOfficial text on nysenate.gov ↗
STATE OF NEW YORK
1736--E
2023-2024 Regular Sessions
IN SENATE
January 13, 2023
Introduced by Sens. KRUEGER, CHU, GOUNARDES, HOYLMAN-SIGAL, JACKSON, MAY, MYRIE, RAMOS, RIVERA, SEPULVEDA -- read twice and ordered printed, and when printed to be committed to the Committee on Housing, Construction and Community Development -- reported… Show allHide
Introduced by Sens. KRUEGER, CHU, GOUNARDES, HOYLMAN-SIGAL, JACKSON, MAY, MYRIE, RAMOS, RIVERA, SEPULVEDA -- read twice and ordered printed, and when printed to be committed to the Committee on Housing, Construction and Community Development -- reported favorably from said committee and committed to the Committee on Energy and Telecommunications -- committee discharged, bill amended, ordered reprinted as amended and recommitted to said committee -- reported favorably from said committee and committed to the Committee on Finance -- committee discharged, bill amended, ordered reprinted as amended and recommitted to said committee -- reported favorably from said committee, ordered to first and second report, ordered to a third reading, amended and ordered reprinted, retaining its place in the order of third reading -- recommitted to the Committee on Housing, Construction and Community Development in accordance with Senate Rule 6, sec. 8 -- reported favorably from said committee and committed to the Committee on Energy and Telecommunications -- committee discharged, bill amended, ordered reprinted as amended and recommitted to said committee -- committee discharged, bill amended, ordered reprinted as amended and recommitted to said committee
AN ACT to amend the executive law, in relation to requiring new construction that includes dedicated off-street parking to provide electric vehicle charging stations and electric vehicle ready parking spaces
The People of the State of New York, represented in Senate and Assembly, do enact as follows:
Section 1. Section 378 of the executive law is amended by adding a new subdivision 17-a to read as follows:
17-a. a. Standards to require new construction that includes dedicated off-street parking involving a garage, driveway, parking lot or other off-street parking, to have:
EXPLANATION--Matter in italics (underscored) is new; matter in brackets
[ ] is old law to be omitted.
LBD03756-18-4
(i) electric vehicle charging stations as defined in paragraph (b) of subdivision one of section three hundred thirty-nine-ll of the real property law; and
(ii) electric vehicle ready parking spaces.
b. For the purposes of this subdivision:
(i) "electric vehicle ready parking space" shall mean a parking space with a dedicated branch circuit that is not less than 208/240-volt and equipped with circuit breakers and other necessary electrical components, terminating in a receptacle, or outlet, as necessary to enable electric vehicle charging;
(ii) "level 2 electric vehicle charging station" shall mean an electric vehicle charging station that provides an alternating current power source at a minimum of 208/240 volts;
(iii) "new construction" shall mean the erection of an entirely new structure not attached or affiliated with any existing construction on the property. "New construction" shall not include a new addition or capital improvement to existing construction nor shall it constitute an addition to the property;
(iv) "mixed-use building" shall mean a building or structure used for both residential and commercial purposes; provided that a mixed-use building shall be considered residential if fifty per centum or less of the aggregate floor area of such building is used or held out for use as commercial space, community facility, or accessory use space and a mixed-use building shall be considered commercial if more than fifty per centum of the aggregate floor area of such building is used or held out for use as commercial space, community facility, or accessory use space;
(v) "direct current fast charging station" shall mean an electric vehicle charging station that is capable of providing a direct current power source at a minimum of 150 kilowatts;
(vi) "electric vehicle energy management system" shall mean a system to control electric vehicle charging station loads comprised of a monitor or monitors, communications equipment, a controller or controllers, a timer or timers and other applicable devices; and
(vii) "automobile parking lift" shall mean a mechanical device designed to vertically lift automobiles and store them on a mobile elevated platform for the purpose of parking.
c. Standards promulgated pursuant to this subdivision shall require that the number of electric vehicle charging stations, and electric vehicle ready parking spaces pursuant to paragraph a of this subdivision shall be as follows:
(i) a one, two or three-family home equipped with a garage, driveway or parking lot, or other off-street parking, shall have at least one electric vehicle ready parking space at not less than 20-ampere for each dwelling unit up to the total number of parking spaces;
(ii) a multi-unit residential building with off-street parking shall have one hundred percent of available parking spaces be at least electric vehicle ready parking spaces at not less than 20-ampere, which shall include at least twenty percent of available parking spaces equipped with level 2 electric vehicle charging stations at not less than 20-ampere. If there is a decimal in the calculation of the percentage of parking spaces, such decimal shall be rounded to the next largest whole number greater than zero. For two adjacent electric vehicle ready parking spaces or level 2 electric vehicle charging stations required by this subparagraph, a single branch circuit of not less than 40-ampere shall be permitted. For buildings with individually metered residential units and parking spaces specifically designated for the use of individual units, electric vehicle ready parking spaces and level 2 electric vehicle charging stations installed in such parking spaces shall be wired to the individual unit's electrical meter, unless deemed infeasible by the local department of buildings or similar entity having jurisdiction;
(iii) a commercial building with between one and ten parking spaces shall have at least one available parking space be an electric vehicle ready parking space at not less than 40-ampere or equipped with a level 2 electric vehicle charging station at not less than 40-ampere or direct current fast charging station;
(iv) a commercial building with eleven or more parking spaces shall have at least twenty percent of available parking spaces be at least electric vehicle ready parking spaces at not less than 40-ampere, which shall include at least ten percent of available parking spaces equipped with level 2 electric vehicle charging stations at not less than 40-ampere or direct current fast charging stations. If there is a decimal in the calculation of the percentage of parking spaces, such decimal shall be rounded to the nearest whole number greater than zero. For every additional electric vehicle ready parking space or level 2 electric vehicle charging station beyond the number required by this subparagraph, two electric vehicle ready parking spaces or level 2 electric vehicle charging stations required by this subparagraph may be served by a single branch circuit of not less than 40-ampere;
(v) for a commercial building subject to the requirements of subparagraph (iv) of this paragraph, the installation of one direct current fast charging station shall be considered equivalent to ten level 2 electric vehicle charging stations or electric vehicle ready parking spaces; and
(vi) for a building subject to subparagraphs (ii) and (iv) of this paragraph that includes an automobile parking lift, the number of parking spaces used to determine the number of required electric vehicle ready parking spaces and level 2 electric vehicle charging stations shall equal the total number of parking spaces minus the number of elevated parking spaces contained in the automobile parking lift.
d. Requirements for installation of electric vehicle charging stations and electric vehicle ready parking spaces under this subdivision may be met by installing multiple electric vehicle charging stations or electric vehicle ready parking spaces on a single branch circuit, when used in conjunction with an electric vehicle energy management system to control charging station loads.
e. The owner of a building subject to paragraph c of this subdivision may apply to the local department of buildings or similar entity for a waiver of the requirements of this subdivision, which such local department of buildings or similar entity may grant if such owner can demonstrate that the provisions present an undue hardship due to limitations of the local utility provider, or that the geographic location of the site is such that compliance would result in a significant burden on the owner.
f. The requirements of this subdivision shall not apply to affordable housing. For the purposes of this subdivision, the term "affordable housing" shall mean a multi-unit residential building subject to an actual or anticipated agreement with a local, state, or federal governmental entity for the purposes of providing affordable housing in a given locality or region.
g. Standards promulgated pursuant to this subdivision shall include requirements for clear and prominent signage denoting the availability and location of electric vehicle ready parking spaces and electric vehicle charging stations.
h. Nothing in this subdivision shall be interpreted or otherwise construed as preempting a municipality from adopting standards, codes, rules, or regulations that are more strict than those contained in this subdivision.
§ 2. This act shall take effect April 1, 2025 and shall apply to contracts for new construction entered into on and after such date.
Reflowed for reading: line numbers and page breaks removed. Cite the official text.
Sponsor's memo
Title of bill
An act to amend the executive law, in relation to requiring new construction that includes dedicated off-street parking to provide elec- tric vehicle charging stations and electric vehicle ready parking spaces
Purpose or general idea of bill
Requires electric vehicle charging stations and electric vehicle ready parking spaces in certain new buildings.
Summary of specific provisions
Section 1 of the bill amends section 378 of the executive law by adding subdivision 17-a. Standards require that new construction with dedicated off-street parking involving a garage, driveway, parking lot or other off-street parking have electric vehicle charging stations or electric vehicle ready parking spaces.
The provisions are as follows:
-One- to three-family homes with off-street parking must have at least one electric vehicle ready parking space for each dwelling unit, up to the total number of spaces.
-Multi-family homes with off-street parking must have 100% of spaces be at least EV ready, with at least 20% of spaces equipped with a level 2 charging station.
-Commercial buildings with between one and ten parking spaces must have at least one space that is EV ready or equipped with a level 2 charging station or a direct current fast charger.
-Commercial buildings with more than ten parking spaces must have at least 20% of spaces be EV ready, which shall include at least 10% of spaces equipped with a Level 2 charging station or a direct current fast charging station.
-Commercial buildings may opt to substitute one direct current fast charging station for 10 required Level 2 charging stations or EV ready spaces.
-Requirements for installation of EV ready spaces or charging stations may be met by installing multiple EV ready spaces or charging stations on a single branch circuit when used in conjunction with an electric vehicle energy management system.
-Building owners may apply for a waiver if they can demonstrate that the provisions present an undue hardship due to limitations of the local utility provider, or,that the geographic location of the site is such that compliance would result in a significant burden on the owner. An example of a scenario where an exemption could be granted is certain buildings on agricultural land.
-clear and prominent signage denoting availability and location of charging stations or EV ready spaces is required. -Municipalities are not preempted from enaction stricter requirements.
Section 2 establishes an effective date of April 1, 2025.
Justification
The presence of electric vehicle (EV) charging stations and parking spaces in a community is associated with greater use of EVs. However, the rate of adoption of EV parking spaces has been slow, mirrored by the slow adoption of EVs themselves. In 2021, New York' State took steps to address to slow adoption of EVs by mandating new vehicles in the state be all-electric by 2035. For the adoption of this policy to be success- ful, the installation of the hardware needed to support a large number of EVs on the road should be a priority of the state. Accordingly, this bill seeks to align New York's construction and building code policy with the goals of the state expressed in the Climate Leadership and Community Protection Act as well as the 2021 EV sales mandate by mandat- ing the installation of EV infrastructure in certain instances during new construction.
Prior legislative history
2021-22: S7406c/A3179d - Passed Senate.
Fiscal implications
To be determined
Effective date
This act shall take effect April 1, 2025
Summaries, headlines and scores are AI-generated from the official bill text. How we score bills. Source: NYS Open Legislation.