What's happening
This bill requires a study on the adequacy of overhead utility line heights for safe passage of agricultural and heavy equipment.
Why it matters
Addresses rural and agricultural safety concerns. by investigating whether current utility line heights adequately protect farmers and operators of heavy equipment from dangerous overhead contact, which can cause costly damage, injury, or even fatalities.
Evaluates the adequacy of existing standards. , specifically the National Electric Safety Code, to determine if they still meet the needs of modern, increasingly large agricultural and heavy machinery, potentially prompting updates to outdated regulations.
Requires a comprehensive statewide review. of actual incidents where vehicles have come into contact with overhead lines, providing data-driven insight into whether the problem is widespread and where risks are greatest.
Creates a formal process for legislative and executive attention. on this infrastructure issue, ensuring the findings are reported directly to state leaders within a set timeframe and potentially influencing future law, funding, or regulatory changes to improve safety.
Albany, before your first meeting.
Every bill that moved yesterday, summarized in a sentence and ranked by impact. The Albany Scorecard follows on Sundays.
Free. Unsubscribe in one click. Want alerts on specific bills? Create an account.
Who cares
Public Service Commission
Its chairperson would be required to study overhead line heights, compliance with national electric safety code height standards and equipment collisions, and report to the governor and legislature within one year.
Farmers and agricultural equipment operators
The study would examine whether line height standards allow increasingly large agricultural equipment to pass safely underneath.
Utilities and communications providers
The study would examine compliance with line height standards and instances of vehicles contacting overhead utility and communications lines.
Off-road heavy-duty equipment operators
The study would assess whether existing line height standards provide safe clearance for their increasingly large equipment.
Headline styles
Study Utility Line Heights
Plain English, a few words. Used as the page title.
Sponsors
No co-sponsors yet.
History
- Vetoed memo.61
- Delivered to governor
- Returned to senate
- Passed assembly
- Ordered to third reading cal.70
- Substituted for A2368
- Referred to energy
- Delivered to assembly
- Passed senateVote 55–2
- Advanced to third reading
- 2nd report cal.
- 1st report cal.295
Show 2 earlier actions
- Referred to energy and telecommunications
- Referred to energy and telecommunications
Companion bill
The same bill in the other chamber. A bill becomes law when one version passes both houses and the governor signs it, so either number can carry it.
Study Utility Line Heights
Assembly Floor Calendar · Sponsor Albert A. Stirpe
Full text
2 pagesUnderlined is new[Struck] is removedOfficial text on nysenate.gov ↗
STATE OF NEW YORK
6310
2023-2024 Regular Sessions
IN SENATE
April 12, 2023
Introduced by Sen. HINCHEY -- read twice and ordered printed, and when printed to be committed to the Committee on Energy and Telecommunications
AN ACT to amend the public service law, in relation to requiring a study on the height of overhead utility lines and communication lines as such relate to the height of agricultural equipment and other heavy duty equipment; and providing for the repeal of such provisions upon expiration thereof
The People of the State of New York, represented in Senate and Assembly, do enact as follows:
Section 1. The public service law is amended by adding a new section 28 to read as follows:
§ 28. Study on the height of overhead utility lines and communication lines; agricultural equipment. 1. The chairperson of the public service commission is hereby authorized and directed to study the implementation of this chapter of law in regard to the height of overhead communication lines or cables including but not limited to telegraph lines and telephone lines, and any other overhead utility line or cable the chairperson deems necessary to complete such study.
2. The study shall include, but not be limited to examining:
a. the use of and compliance with the national electric safety code line height standard;
b. instances of vehicles, including but not limited to agricultural equipment and any other off-road heavy duty equipment, coming into contact with communication lines, utility lines and any other overhead line or cable; and
c. whether such national electric safety code line height standard is sufficient with the increased size of agricultural equipment and other off-road heavy duty equipment to ensure safe passage of such equipment under such lines or cables.
EXPLANATION--Matter in italics (underscored) is new; matter in brackets
[ ] is old law to be omitted.
LBD02106-01-3
3. The study conducted pursuant to this section shall be completed and a report on such study shall be submitted to the governor and the legislature no later than one year after the effective date of this section.
§ 2. This act shall take effect immediately and shall expire and be deemed repealed January 1, 2026.
Reflowed for reading: line numbers and page breaks removed. Cite the official text.
Sponsor's memo
Title of bill
An act to amend the public service law, in relation to requiring a study on the height of overhead utility lines and communication lines as such relate to the height of agricultural equipment and other heavy duty equipment; and providing for the repeal of such provisions upon expira- tion thereof
Purpose
The purpose of this bill is to have the chairperson of the Public Service Commission conduct a study to determine whether the use of and compliance with national electric safety code line height that sets the height parameters for overhead utility lines and communication lines is compatible with the height of agricultural equipment and other heavy duty equipment that travel below such lines.
Summary of provisions
Section 1: Amends Public Service Law by adding a new section 28 direct- ing the chairperson of the Public Service Commission to conduct the study and defines the scope of the study.
Section 2: Sets effective date.
Justification
Currently, the National Electric Safety Code's minimum height require- ments for communications lines (cable tv, phone, fiber, etc.) and neutral lines is 15.5 ft. According the New York Farm Bureau, this height is not compatible for modern farm equipment. As a result, there have been instances, according to the Bureau, where farmers cannot access their fields without hitting lines. Farmers often see these new lines going up and try to work with utility companies to either raise the lines or bury a portion of them to provide access to their fields. Unfortunately, not every effort produces the desired result. Further- more, there are instances in which farmers do not know of lines that are constructed until after the completion of construction whereupon it is too late to work with the companies erecting the lines to address height concerns. Therefore, this bill is being introduced to determine whether the National Electric Safety Code line height standard is compatible with the increased size of agricultural equipment and other off-road heavy-duty equipment to ensure safe passage of such equipment under lines and cables.
Legislative history
2022: A.10317 - Referred to Energy
Fiscal implications
To be determined.
Effective date
This act shall take effect immediately and shall expire and be deemed repealed January 1, 2026.
Summaries, headlines and scores are AI-generated from the official bill text. How we score bills. Source: NYS Open Legislation.