What's happening
This bill directs the Public Service Commission to study and recommend improvements for faster renewable energy integration into New York's electrical grid.
Why it matters
Examines regulatory barriers and inefficiencies. The bill directs the Public Service Commission to analyze if current rules and timelines for connecting renewable energy projects to the grid are slowing down progress toward state climate goals—highlighting potential bottlenecks that could delay clean energy deployment.
Considers reform ideas from other systems. By looking at models like the UK's "Enabling Works" and "Connect and Manage," the study could bring in proven strategies from elsewhere, potentially leading to innovative, faster, and more reliable grid integration practices in New York.
Explores cost allocation and upgrade processes. The legislation asks whether grid upgrades required for new projects can be managed more efficiently—possibly shifting some costs and responsibilities, which could affect project developers, utilities, and ultimately ratepayers.
Addresses both large-scale and distributed energy. By requiring review of how transmission-level changes might also benefit distribution-level processes (like local solar or storage), the bill could influence the speed and cost-effectiveness of a wide range of renewable energy projects, from large wind farms to neighborhood energy storage.
Albany, before your first meeting.
Every bill that moved yesterday, summarized in a sentence and ranked by impact. The Albany Scorecard follows on Sundays.
Free. Unsubscribe in one click. Want alerts on specific bills? Create an account.
Who cares
Public Service Commission
The bill would require the commission to study barriers to faster grid connections and report findings and recommendations to the governor and legislative leaders within one year.
Renewable energy developers
The study would examine faster connection options, required studies and network upgrades, and potential allocation of upgrade costs to generators.
New York Independent System Operator
The study would assess its interconnection reforms and whether its comprehensive system planning process could identify more efficient grid upgrades.
Energy storage developers
The commission would examine improvements to the interconnection process for qualified energy storage systems.
Headline styles
Study Energy Grid Connections
Plain English, a few words. Used as the page title.
Sponsors
No co-sponsors yet.
History
- Print number 8628a
- Amend and recommit to energy and telecommunications
- Referred to energy and telecommunications
Companion bill
The same bill in the other chamber. A bill becomes law when one version passes both houses and the governor signs it, so either number can carry it.
Study Power Grid Connections
In Assembly Committee · Energy · Sponsor Albert A. Stirpe
Full text
2 pagesUnderlined is new[Struck] is removedOfficial text on nysenate.gov ↗
STATE OF NEW YORK
8628--A
IN SENATE
February 22, 2024
Introduced by Sen. MAY -- read twice and ordered printed, and when printed to be committed to the Committee on Energy and Telecommunications -- committee discharged, bill amended, ordered reprinted as amended and recommitted to said committee
AN ACT to authorize and direct the public service commission to conduct a study on the deployment of energy interconnection processes into the electrical grid
The People of the State of New York, represented in Senate and Assembly, do enact as follows:
Section 1. Study. The public service commission is authorized and directed to conduct a study on the regulatory barriers, if any, to the rapid deployment of energy interconnection processes in the state that shall include, but not be limited to:
(a) Potential changes to the interconnection process to rapidly bring new renewable energy resources onto the electrical grid to meet the state's renewable energy goals set out under the climate leadership and community protection act, as amended;
(b) The state's ability to comply with goals established in the climate leadership and community protection act, as amended, with current energy interconnection process timelines, including the effect of recent reforms by the New York Independent System Operator and any additional anticipated reforms;
(c) The experience of other interconnection systems using "Connect and Manage" or other alternative connection agreements in terms of the speed of resource deployments and electrical grid reliability;
(d) The extent to which the studies and network upgrades currently required for Energy Resource Interconnection Service projects in the New York Independent System Operator go beyond the minimal set of studies and network upgrades needed to safely operate the system with a new resource, in comparison to the United Kingdom's Enabling Works approach;
(e) Whether it is possible to identify more efficient system upgrades in the context of the New York Independent System Operator comprehensive system planning process rather than certain studies and upgrades currently in the energy interconnection process;
EXPLANATION--Matter in italics (underscored) is new; matter in brackets
[ ] is old law to be omitted.
LBD14526-03-4
(f) Whether projects that initially join the system with Energy Resource Interconnection Service status can be elevated to the Network Resource Interconnection Service status upon completion of relevant network upgrades, to determine if there is a mechanism by which generators could be allocated part of the cost of such upgrades, if such upgrades are completed via the comprehensive system planning process rather than the energy interconnection process;
(g) Improvements to the interconnection process for qualified energy storage systems as defined by subdivision 1 of section 74 of the public service law; and
(h) Whether any changes identified in this study at the transmission level would also improve processes at the distribution level.
§ 2. Report. No later than one year after the effective date of this act, the public service commission shall submit to the governor, the speaker of the assembly and the temporary president of the senate, a report assessing its findings under the study conducted pursuant to section one of this act, and any recommendations to rapidly bring new renewable energy resources onto the electrical grid to meet the state's renewable energy goals set out under the climate leadership and community protection act, as amended.
§ 3. Definitions. For the purposes of this act, the following terms shall have the following meanings:
(a) "Energy interconnection process" means the process of integrating new sources of renewable energy resources, as defined by section 1-103 of the energy law, into the electrical grid.
(b) "Electrical grid" means the network of electric plants and other electric generating facilities and equipment, and electricity transmission and distribution systems in the state.
(c) "Renewable energy resources" shall have the same meaning as defined by section 1-103 of the energy law.
§ 4. This act shall take effect immediately.
Reflowed for reading: line numbers and page breaks removed. Cite the official text.
Sponsor's memo
Title of bill
An act to authorize and direct the public service commission to conduct a study on the deployment of energy interconnection processes into the electrical grid
Purpose
To produce a study on regulatory barriers to the deployment of energy interconnection processes in the state
Summary of specific provisions
Section 1 authorizes the public service commission to conduct a study on the deployment of energy interconnection processes
Section 2 directs the public service commission to submit a report on their findings to the governor, the speaker of the assembly, and tempo- rary president of the senate, along with any recommendations
Section 3 provides definitions for "energy interconnect on process," "electrical grid," and "renewable energy resources"
Section 4 establishes the effective date of the bill
Justification
In order to reach the goals set out by the Climate and Community Protection Act, New York state most examine how each part of our power system works and maximize the efficiency at which we operate. One area that has received lots of national focus is the interconnection process. Interconnection is the process through which power generation facilities are connected to the larger energy grid. Last July, the Federal Energy Regulatory Commission (FERC) mandated changes to transmission providers' interconnection rules, aiming to address requests from generators and energy storage developers to connect to the grid.
One process that has received a lot of attention is a "connect and manage" approach. In our current approach, there is an interconnection queue, and a study has to be completed for each proposed project to ensure that the overall grid system has capacity before a project is allowed to connect to the grid. The queue can be delayed because an extensive study has to be completed for each proposed energy production facility. However, in a connect and manage approach, production gener- ation facilities are brought onto the grid, and then the grid operator directs the facility to curtail energy production if needed during times of high congestion on the grid. This allows for much faster deployment of new renewable energy generation projects, as this is a much more efficient process. The Electric Reliability Council of Texas (ERCOT) has seen success in bringing in new energy at a rapid clip onto the grid after adopting this type of approach.
This bill is designed to holistically study our interconnection process in New York State and ensure that our process is able to bring enough renewable energy onto the grid to hit our important climate change goals. There are a wide variety of system changes, processes, and new technologies that can be studied to ensure maximum productivity in bringing new electric production onto the grid.
Legislative history
New bill
Fiscal inwlications
To be determined
Effective date
Immediately