What's happening
This bill requires gas companies in New York to file and implement plans for replacing aging or leaking pipelines to improve safety and reduce gas leaks.
Why it matters
Mandates accelerated replacement of leak-prone pipelines. Gas companies must create detailed, long-term plans—subject to public review and approval—that prioritize replacing the most hazardous infrastructure, with a target completion within 20 years or another reasonable timeframe. This can lead to safer communities and a reduction in hazardous events.
Links safety upgrades to consumer protections and cost controls. The bill caps how much of the costs gas companies can recover from ratepayers each year (1.5% of the company’s total firm revenues), and requires annual commission reviews to ensure only reasonable and prudent costs are passed on. If companies overcharge or mismanage funds, they must refund customers.
Requires transparency, accountability, and ongoing oversight. Gas companies must submit annual progress reports, project documentation, and updated timelines to the Public Service Commission, which retains authority to modify or even discontinue programs if companies fail to comply or control costs.
Targets public safety, environmental, and affordability concerns. By focusing on leak-prone pipes, the legislation aims to reduce gas leaks (which can contribute to both explosions and climate change through methane emissions), while also requiring consideration for vulnerable ratepayers, such as those receiving energy assistance.
Albany, before your first meeting.
Every bill that moved yesterday, summarized in a sentence and ranked by impact. The Albany Scorecard follows on Sundays.
Free. Unsubscribe in one click. Want alerts on specific bills? Create an account.
Who cares
Headline styles
Fix Leaking Gas Pipelines
Plain English, a few words. Used as the page title.
Sponsors
Senator · Senate District 14
No co-sponsors yet.
History
- Referred to energy and telecommunications
- Referred to energy and telecommunications
Companion bill
The same bill in the other chamber. A bill becomes law when one version passes both houses and the governor signs it, so either number can carry it.
Fix Leaking Gas Pipes
In Assembly Committee · Corporations, Authorities And Commissions · Sponsor Robert J. Rodriguez
Full text
3 pagesUnderlined is new[Struck] is removedOfficial text on nysenate.gov ↗
STATE OF NEW YORK
3613
2019-2020 Regular Sessions
IN SENATE
February 11, 2019
Introduced by Sen. COMRIE -- read twice and ordered printed, and when printed to be committed to the Committee on Energy and Telecommunications
AN ACT to amend the public service law, in relation to requiring gas corporations to file a plan addressing aging or leaking pipelines within their service territory
The People of the State of New York, represented in Senate and Assembly, do enact as follows:
Section 1. The public service law is amended by adding a new section 68-b to read as follows:
§ 68-b. Aging or leaking pipelines. 1. Definitions. For the purposes of this section, the following words, shall, unless the context clearly requires otherwise, have the following meanings:
(a) "Customer" shall mean a retail customer receiving end use service from a gas corporation.
(b) "Eligible infrastructure replacement" shall mean a replacement or an improvement of existing pipeline of gas corporation that: (i) is performed on or after January first, two thousand twenty; (ii) is designed to improve public safety and/or infrastructure reliability; (iii) does not increase the revenue of a gas corporation by connecting an improvement or installing new pipeline for the principal purpose of serving new customers; (iv) reduces, or has the potential to reduce, lost and unaccounted for gas through a reduction in gas leaks; and (v) is not included in the approved rate base of the gas corporation as determined in the gas corporation's most recent approved rate plan.
(c) "Gas infrastructure rate plan" shall mean a pipeline replacement program construction plan that a gas corporation files with the commission pursuant to subdivision two of this section.
(d) "Project" shall mean an eligible pipeline replacement project proposed by a gas corporation in a plan filed under this section.
EXPLANATION--Matter in italics (underscored) is new; matter in brackets
[ ] is old law to be omitted.
LBD07013-01-9
S. 3613 2
2. A gas corporation shall file with the commission a plan to address aging or leaking pipeline within its respective service territory in the interest of public safety and reducing lost and unaccounted for gas through a reduction in gas leaks. The filing of the plan required pursuant to this subdivision shall be submitted no later than the thirtyfirst of October, two thousand twenty.
3. (a) Any plan filed with the commission shall include, but not be limited to: (i) eligible pipeline replacement of mains, service lines, metering sets, and other ancillary facilities composed of non-cathodically protected steel, cast iron, wrought iron, and any other material the commission deems leak-prone, prioritized to implement the federal gas distribution pipeline integrity management plan annually submitted to the commission and consistent with subpart P of 49 C.F.R. part 192; (ii) an anticipated timeline for the completion of each project; (iii) the estimated cost of each project; (iv) rate change requests; (v) a description of customer costs and benefits under the plan; and (vi) any other information the department considers necessary to evaluate the plan.
(b) Upon the filing of the plan required under this section, a gas corporation shall include a timeline for removing all leak-prone pipeline on an accelerated basis, specifying an annual replacement pace and program end date with a target end date of either: (i) not more than twenty years; or (ii) a reasonable target end date considering the allowable recovery cap established pursuant to subdivision six of this section. The commission shall not approve a timeline as part of a plan unless the allowable recovery cap established pursuant to subdivision six of this section provides the gas corporation with a reasonable opportunity to recover its expenditures related with removing all leakprone infrastructure and the accelerated basis set forth under the timeline utilizing the cost recovery mechanism established pursuant to this section. After filing the initial plan, a gas corporation shall, no later than the thirty-first of October of each succeeding year, at annual intervals, provide the commission with a summary of its replacement progress to date, a summary of work to be completed during the subsequent year and any additional information the commission may require. The commission may require a gas corporation to file an updated longterm timeline as part of a plan if it alters the cap established pursuant to subdivision six of this section.
4. If a gas corporation files a plan on or before October thirty-first for the subsequent construction year, the commission shall review the plan within six months. The plan shall be effective as of the date of the filing, pending commission review. The commission may modify a plan prior to approval at the request of a corporation or make other modifications to a plan as a condition of approval. The commission shall consider the costs and benefits of the plan including, but not limited to, ratepayer impact, with special consideration of customers receiving assistance through the home energy assistance plan, reductions of lost and unaccounted for gas through a reduction in gas leaks and improvements to public safety. The commission shall give priority review and give preliminary acceptance to plans specifically designed to address leak-prone pipeline most immediately in need of replacement, based on standards established by the commission.
5. If the commission determines a plan is in compliance with the requirements of this section and would reasonably accelerate pipeline replacements and provide benefits, the commission shall issue acceptance in whole or in part. A gas corporation shall then be authorized to begin
S. 3613 3
recovery of the estimated costs of projects included in the plan beginning on May first of the year following the initial filing and collect any revenue requirement, including depreciation, property taxes and return associated with the plan.
6. On or before May first of each year, a gas corporation shall file final project documentation for projects completed in the prior year to demonstrate substantial compliance with the plan approved pursuant to subdivision five of this section and that all project costs were reasonably and prudently incurred. The commission shall investigate project costs within six months of submission and shall approve and reconcile the authorized rate factor, if necessary, upon a determination that the costs were reasonable and prudent. Annual changes in the revenue requirement eligible for recovery shall not exceed one-and-one half percent of the gas corporation's most recent calendar year of total firm revenues, including revenues attributable to transmission and distribution customers. Any revenue requirement approved by the commission in excess of such cap may be deferred for recovery in the following year.
7. All rate change requests made to the commission pursuant to an approved plan shall be filed annually on a fully reconciling basis, subject to acceptance by the commission pursuant to subdivision five of this section. The rate change included in a plan pursuant to subdivision three of this section, reviewed pursuant to subdivision five of this section and taking effect on May first pursuant to subdivision six of this section shall be subject to review by the commission, to determine whether the gas corporation has over-collected or under-collected its requested rate adjustment with any such discrepancies reconciled on an annual basis. If the commission determines that any of the costs were not reasonably or prudently incurred by a gas corporation, the commission shall disallow the costs and direct the gas corporation to refund the full value of the costs charged to customers with the appropriate carrying charges on the over-collected amounts. If the commission determines that any of the costs were not in compliance with the approved plan, the commission shall disallow the costs from the cost recovery mechanism established under this section and shall direct the gas corporation to refund the full value of the costs charged to customers with the appropriate carrying charges on the over-collected amounts.
8. The commission may promulgate any rules and regulations necessary to effectuate the pipeline replacement program pursuant to this section. The commission may discontinue the replacement program and require a gas corporation to refund any costs charged to customers due to failure to substantially comply with a plan or failure to reasonably and prudently manage project costs.
§ 2. This act shall take effect immediately.
Reflowed for reading: line numbers and page breaks removed. Cite the official text.
Sponsor's memo
Title of bill
An act to amend the public service law, in relation to requiring gas corporations to file a plan addressing aging or leaking pipelines within their service territory
Purpose or general idea of bill
To require gas corporations to develop strategic pipeline infrastructure replacement.
Summary of specific provisions
Section 1 amends the public service law by adding a new section 63-gg called Pipeline modernization and consumer protection.
Part 1 establishes the definition of "gas pipeline facility", which is a distribution facility and gas utility.
Part 2 establishes that each operator of a gas pipeline facility will accelerate the repair, rehabilitation, and replacement of gas piping or equipment that is: (a) leaking; or (b) may pose high risks of leaking, or may no longer be fit for service, because of: (i) inferior materials, (ii) poor construction practices, (iii) lack of maintenance, or (iv) age.
Part 3 establishes that in complying with subdivision two of this section, the commission shall: (a) develop prioritized timelines to repair all leaks based on the severity of the leak; (b) adopt a cost-re- covery program; (c) adopt a standard definition and methodology for calculating and reporting unaccounted for gas to improve data quali- ty;(d) adopt limits on cost recovery for the lost and unaccounted for gas; and (e) require the use of the best available technology to detect gas leaks.
Part 4 establishes that the New York State energy research and develop- ment authority will issue non-binding guidelines to identify the best practices for classifying high-risk pipeline infrastructure and leaks for repair or replacement. This will take place no later than one year after the effective date.
Part 5 establishes that the New York State energy research and develop- ment authority and the commission, no later than a year after the effec- tive date, will create and publish forms that adopt a standard defi- nition and methodology for calculating and reporting unaccounted for gas.
Part 6 establishes that operators of gas pipeline facilities in cities with a population of one million or more shall establish a database of pipeline infrastructure that will be shared with the coordinated buil- dinginspection date analysis.
Justification
Federal requirements related to repairing pipeline leaks are limited to hazardous leaks, which are leaks that represent an existing or probable hazard to persons or property and require immediate repair. There are no Federal requirements to address slower or less hazardous leaks, which can allow the leaks to persist =repaired indefinitely. According to the Pipeline and Hazardous Materials Safety Administration, the United States natural gas distribution system still includes 61,000 miles of bare steel pipe without adequate corrosion protection and 32,000 miles of cast iron pipe, which was installed beginning in the 1830s and can be prone to failure. Major recent pipeline explosions that led to human fatalities occurred in: Austin, Texas; Philadelphia, Pennsylvania; and Allentown, Pennsylvania. These explosions were the result of aging, leaking, and high-risk pipeline infrastructure.
This bill will help create a higher standard of safety in terms of pipe- line infrastructure, and will lower the cost of the rate that consumers have to pay for lost and unaccounted for gas. This bill will also help to improve the environment by limiting the amount of natural gas that leaks out of faulty pipelines.
Prior legislative history
A656 2017/18-referred to Corporations, Authorities and Commissions
Fiscal implications
Likely costs related to administrative work of the Department of Public Service.
Effective date
This bill shall take effect immediately.