Skip to content
A3179Assembly2021-2022 SessionSame asS7406

Require EV Charging at Parking

Official title

“Requires electric vehicle charging stations and electric vehicle capable parking spaces”

Sponsor Patricia FahyAD-109+16 co-sponsorsAffects Legal
Status
Assembly Floor Calendar
Impact
7/10
Significant
Passage
0%

Bill progress

Step 3 of 7

Floor calendar · May 31

What's happening

This bill requires new construction in New York with off-street parking to include electric vehicle charging stations and EV-capable parking spaces.

Why it matters

  1. The bill sets detailed minimum requirements for EV charging infrastructure. in all new residential and commercial buildings with off-street parking, not just mandating a token presence but tying the number of EV-capable and fully equipped charging spots to the size and type of the property.

  2. It ensures future-proofing for electric vehicle adoption. by requiring that even if not all parking spots have charging stations installed, the wiring and electrical capacity must be sufficient for future upgrades, reducing costly retrofits as EV usage grows.

  3. There are significant differences based on building type and size. single-family homes must include at least one EV-ready spot, while larger residential and commercial buildings must have a high percentage—up to 100%—of parking spaces EV-capable, with 20-40% having active charging stations.

  4. A waiver process is included for property owners facing genuine hardships,. such as utility limitations or geographic challenges, meaning the law aims for broad implementation but recognizes that not all sites may be able to comply immediately.

The daily · weekday mornings

Albany, before your first meeting.

Every bill that moved yesterday, summarized in a sentence and ranked by impact. The Albany Scorecard follows on Sundays.

Free. Unsubscribe in one click. Want alerts on specific bills? Create an account.

Headline styles

Require EV Charging at Parking

Plain English, a few words. Used as the page title.

Sponsors

History

  1. Ordered to third reading rules cal.444
  2. Rules report cal.444
  3. Reported
  4. Reported referred to rules
  5. Print number 3179d
  6. Amend and recommit to codes
  7. Reported referred to codes
  8. Print number 3179c
  9. Amend and recommit to governmental operations
  10. Print number 3179b
  11. Amend and recommit to governmental operations
  12. Referred to governmental operations
Show 3 earlier actions
  1. Print number 3179a
  2. Amend and recommit to governmental operations
  3. Referred to governmental operations

Companion bill

The same bill in the other chamber. A bill becomes law when one version passes both houses and the governor signs it, so either number can carry it.

S7406Senate

Require EV Charging in New Buildings

In Assembly Committee · Codes · Sponsor Liz Krueger

Impact 8 · Significant0% to pass

Full text

2 pagesUnderlined is new[Struck] is removedOfficial text on nysenate.gov ↗

STATE OF NEW YORK

3179--D

2021-2022 Regular Sessions

IN ASSEMBLY

January 22, 2021

Introduced by M. of A. FAHY, GOTTFRIED, JACKSON, McDONALD, DICKENS, THIELE, SEAWRIGHT, BURDICK, SIMON, STECK, WOERNER, K. BROWN, CLARK, L. ROSENTHAL, OTIS -- read once and referred to the Committee on Governmental Operations -- committee discharged, bill… Show all

Introduced by M. of A. FAHY, GOTTFRIED, JACKSON, McDONALD, DICKENS, THIELE, SEAWRIGHT, BURDICK, SIMON, STECK, WOERNER, K. BROWN, CLARK, L. ROSENTHAL, OTIS -- read once and referred to the Committee on Governmental Operations -- committee discharged, bill amended, ordered reprinted as amended and recommitted to said committee -- recommitted to the Committee on Governmental Operations in accordance with Assembly Rule 3, sec. 2 -- committee discharged, bill amended, ordered reprinted as amended and recommitted to said committee -- again reported from said committee with amendments, ordered reprinted as amended and recommitted to said committee -- reported and referred to the Committee on Codes -- committee discharged, bill amended, ordered reprinted as amended and recommitted to said committee

AN ACT to amend the executive law, in relation to requiring electric vehicle charging stations and electric vehicle capable parking spaces

The People of the State of New York, represented in Senate and Assembly, do enact as follows:

Section 1. Section 378 of the executive law is amended by adding a new subdivision 17-a to read as follows:

17-a. a. Standards to require new construction that includes dedicated off-street parking involving a garage, driveway, parking lot or other off-street parking, to have:

(i) electric vehicle charging stations as defined in paragraph (b) of subdivision one of section three hundred thirty-nine-ll of the real property law; and

(ii) electric vehicle capable parking spaces, which have the appropriate wiring, electric panels, and the appropriate space to install appropriate electric service for an electric vehicle charging station.

b. Such standards shall require that the number of electric vehicle capable parking spaces pursuant to subparagraph (ii) of paragraph a of this subdivision shall be as follows:

EXPLANATION--Matter in italics (underscored) is new; matter in brackets

[ ] is old law to be omitted.

LBD07051-10-2

(i) a one, two or three-family home equipped with a garage, driveway or parking lot, or other off-street parking, shall have at least one electric vehicle capable parking space. For the purposes of this subparagraph, "new construction" shall mean the erection of an entirely new structure not attached or affiliated with any existing construction on the property. "New construction" shall not include a new addition or capital improvement to existing construction nor shall it constitute an addition to the property;

(ii) a multi-unit residential building with between two and ten parking spaces shall have at least seventy-five percent of available parking spaces be electric vehicle capable parking spaces, which shall include at least twenty percent of available parking spaces as electric vehicle charging stations. If there is a decimal in the calculation of the percentage of parking spaces, such decimal shall be rounded to the next largest whole number;

(iii) a multi-unit residential building with at least eleven parking spaces shall have one hundred percent of available parking spaces be electric vehicle capable parking spaces, which shall include at least forty percent of available parking spaces as electric vehicle charging stations. If there is a decimal in the calculation of the percentage of parking spaces, such decimal shall be rounded to the next largest whole number;

(iv) a privately-owned commercial building with between two and ten parking spaces shall have one hundred percent of available parking spaces be electric vehicle capable parking spaces, which shall include at least twenty percent of available parking spaces as electric vehicle charging stations with at least a 208-240 volt, 40 amp circuit;

(v) a privately-owned commercial building with at least eleven parking spaces shall have one hundred percent of available parking spaces be electric vehicle capable parking spaces, which shall include at least forty percent of available parking spaces as electric vehicle charging stations with at least a 208-240 volt, 40 amp circuit; and

(vi) a privately-owned commercial building subject to the requirements of subparagraph (iv) or (v) of this paragraph, the installation of one 400-900 volt direct current fast charging station shall be considered equivalent to five required electric vehicle charging stations of lower voltage.

c. For the purposes of this subdivision, "privately-owned commercial building" shall mean any newly constructed commercial building under private contract which has not received state capital funding for such construction.

d. The owner of a building subject to paragraph b of this subdivision may apply to the local department of buildings or similar entity for a waiver of the requirements of this subdivision, which such local department of buildings or similar entity may grant if such owner can demonstrate that the provisions present an undue hardship due to limitations of the local utility provider, or that the geographic location of the site is such that compliance would result in a significant burden on the owner.

§ 2. This act shall take effect April 1, 2023 and shall apply to contracts for new construction entered into on and after such date.

Reflowed for reading: line numbers and page breaks removed. Cite the official text.

Summaries, headlines and scores are AI-generated from the official bill text. How we score bills. Source: NYS Open Legislation.