Require EV Charging in New Buildings

Official title

“Requires electric vehicle charging stations and electric vehicle capable parking spaces”

Sponsor Liz KruegerSD-28+10 co-sponsorsAffects Legal
Status
In Assembly Committee
Codes
Impact
8/10
Significant
Passage
0%

Bill progress

Step 5 of 7

In Assembly · Codes

What's happening

This bill requires new construction with off-street parking in New York to include electric vehicle charging stations and EV-capable parking spaces.

Why it matters

  1. Accelerates EV adoption and infrastructure readiness. By mandating EV charging stations and EV-capable wiring in new construction, the law removes a major barrier for current and future electric vehicle owners, making ownership more practical and attractive across New York.

  2. Applies to a wide range of buildings. The requirements cover everything from single-family homes to large multi-unit residential and commercial buildings, ensuring that EV infrastructure is built into both residential neighborhoods and business districts.

  3. Promotes long-term cost savings and future-proofing. Installing wiring and charging capacity during construction is much cheaper and less disruptive than retrofitting later, potentially saving property owners money and hassle as EV adoption grows.

  4. Includes flexibility for hardship situations. The bill allows for waivers if meeting these requirements would place an undue burden on property owners due to utility limitations or unique site challenges, balancing ambitious infrastructure goals with practical constraints.

The daily · weekday mornings

Albany, before your first meeting.

Every bill that moved yesterday, summarized in a sentence and ranked by impact. The Albany Scorecard follows on Sundays.

Free. Unsubscribe in one click. Want alerts on specific bills? Create an account.

Who cares

  • Homebuilders and multifamily developers

    New construction with off-street parking would face EV-ready parking requirements, including at least one capable space for one- to three-family homes and charging stations for covered multifamily buildings.

  • Private commercial developers

    Covered new buildings would need all parking spaces to be EV-capable and at least 20% or 40% equipped with chargers, depending on parking capacity, with credit for fast chargers.

  • Local building departments

    They could grant owners waivers for undue hardship caused by local utility limitations or significant burdens tied to a site's geographic location.

  • Electric vehicle drivers

    The bill would require charging stations and infrastructure for future chargers at covered new residential and commercial buildings with off-street parking.

Headline styles

Require EV Charging in New Buildings

Plain English, a few words. Used as the page title.

Sponsors

History

  1. Referred to codes
  2. Delivered to assembly
  3. Passed senateVote 42–21
  4. Amended on third reading 7406c
  5. Amended on third reading 7406b
  6. Advanced to third reading
  7. 2nd report cal.
  8. 1st report cal.869
  9. Reported and committed to finance
  10. Print number 7406a
  11. Amend and recommit to housing, construction and community development
  12. Referred to housing, construction and community development
Show 1 earlier action
  1. Referred to rules

Companion bill

The same bill in the other chamber. A bill becomes law when one version passes both houses and the governor signs it, so either number can carry it.

A3179Assembly

Require EV Charging at Parking

Assembly Floor Calendar · Sponsor Patricia Fahy

Impact 7 · Significant0% to pass

Full text

2 pagesUnderlined is new[Struck] is removedOfficial text on nysenate.gov ↗

STATE OF NEW YORK

7406--C Cal. No. 869

2021-2022 Regular Sessions

IN SENATE

September 29, 2021

Introduced by Sens. KRUEGER, BIAGGI, GOUNARDES, HOYLMAN, JACKSON, KAPLAN, KENNEDY, MYRIE, RAMOS, RIVERA, SEPULVEDA -- read twice and ordered printed, and when printed to be committed to the Committee on Rules -- recommitted to the Committee on Housing,… Show all

Introduced by Sens. KRUEGER, BIAGGI, GOUNARDES, HOYLMAN, JACKSON, KAPLAN, KENNEDY, MYRIE, RAMOS, RIVERA, SEPULVEDA -- read twice and ordered printed, and when printed to be committed to the Committee on Rules -- recommitted to the Committee on Housing, Construction and Community Development in accordance with Senate Rule 6, sec. 8 -committee discharged, bill amended, ordered reprinted as amended and recommitted to said committee -- reported favorably from said committee and committed to the Committee on Finance -- reported favorably from said committee, ordered to first and second report, ordered to a third reading, amended and ordered reprinted, retaining its place in the order of third reading -- again amended and ordered reprinted, retaining its place in the order of third reading

AN ACT to amend the executive law, in relation to requiring electric vehicle charging stations and electric vehicle capable parking spaces

The People of the State of New York, represented in Senate and Assembly, do enact as follows:

Section 1. Section 378 of the executive law is amended by adding a new subdivision 17-a to read as follows:

17-a. a. Standards to require new construction that includes dedicated off-street parking involving a garage, driveway, parking lot or other off-street parking, to have:

(i) electric vehicle charging stations as defined in paragraph (b) of subdivision one of section three hundred thirty-nine-ll of the real property law; and

(ii) electric vehicle capable parking spaces, which have the appropriate wiring, electric panels, and the appropriate space to install appropriate electric service for an electric vehicle charging station.

b. Such standards shall require that the number of electric vehicle capable parking spaces pursuant to subparagraph (ii) of paragraph a of this subdivision shall be as follows:

EXPLANATION--Matter in italics (underscored) is new; matter in brackets

[ ] is old law to be omitted.

LBD07051-11-2

(i) a one, two or three-family home equipped with a garage, driveway or parking lot, or other off-street parking, shall have at least one electric vehicle capable parking space. For the purposes of this subparagraph, "new construction" shall mean the erection of an entirely new structure not attached or affiliated with any existing construction on the property. "New construction" shall not include a new addition or capital improvement to existing construction nor shall it constitute an addition to the property;

(ii) a multi-unit residential building with between two and ten parking spaces shall have at least seventy-five percent of available parking spaces be electric vehicle capable parking spaces, which shall include at least twenty percent of available parking spaces as electric vehicle charging stations. If there is a decimal in the calculation of the percentage of parking spaces, such decimal shall be rounded to the next largest whole number;

(iii) a multi-unit residential building with at least eleven parking spaces shall have one hundred percent of available parking spaces be electric vehicle capable parking spaces, which shall include at least forty percent of available parking spaces as electric vehicle charging stations. If there is a decimal in the calculation of the percentage of parking spaces, such decimal shall be rounded to the next largest whole number;

(iv) a privately-owned commercial building with between two and ten parking spaces shall have one hundred percent of available parking spaces be electric vehicle capable parking spaces, which shall include at least twenty percent of available parking spaces as electric vehicle charging stations with at least a 208-240 volt, 40 amp circuit;

(v) a privately-owned commercial building with at least eleven parking spaces shall have one hundred percent of available parking spaces be electric vehicle capable parking spaces, which shall include at least forty percent of available parking spaces as electric vehicle charging stations with at least a 208-240 volt, 40 amp circuit; and

(vi) a privately-owned commercial building subject to the requirements of subparagraph (iv) or (v) of this paragraph, the installation of one 400-900 volt direct current fast charging station shall be considered equivalent to five required electric vehicle charging stations of lower voltage.

c. For the purposes of this subdivision, "privately-owned commercial building" shall mean any newly constructed commercial building under private contract which has not received state capital funding for such construction.

d. The owner of a building subject to paragraph b of this subdivision may apply to the local department of buildings or similar entity for a waiver of the requirements of this subdivision, which such local department of buildings or similar entity may grant if such owner can demonstrate that the provisions present an undue hardship due to limitations of the local utility provider, or that the geographic location of the site is such that compliance would result in a significant burden on the owner.

§ 2. This act shall take effect April 1, 2023 and shall apply to contracts for new construction entered into on and after such date.

Reflowed for reading: line numbers and page breaks removed. Cite the official text.

Sponsor's memo

Title of bill

An act to amend the executive law, in relation to requiring electric vehicle charging stations and electric vehicle capable parking spaces

Purpose or general idea of bill

Requires electric vehicle charging stations and electric vehicle capable parking spaces in certain new buildings.

Summary of specific provisions

Section 1 of the bill amends section 378 of the executive law by adding subdivision 17-a. Standards require that new construction with dedicated off-street parking involving a garage, driveway, parking lot or other off-street parking have electric vehicle charging stations or appropri- ate wiring, panels, and installation space to install charging stations in the future.

The provisions are as follows:

- One- to three-family homes with off-street parking must have one elec- tric vehicle capable parking space.

- Multi-family homes with between two and ten parking spaces must have at least 75% EV capable spaces, with at least 20% of spaces equipped with a charging station.

- Multi-family homes with more than ten parking spaces must have 100% of spaces be EV capable, with at least 40% of spaces equipped with a charg- ing station.

- Privately-owned commercial buildings with between two and ten parking spaces must have 100% of spaces be EV capable, with at least 20% of spaces equipped with at least a Level 2 charging station.

- Privately-owned commercial buildings with more than ten parking spaces must have 100% of spaces be EV capable, with at least 40% of spaces equipped with at least a Level 2 charging station.

- Commercial buildings may opt to substitute one Level 3 charging station for five required Level 2 charging stations.

- Building owners may apply for a waiver if they can demonstrate that the provisions present an undue hardship due to limitations of the local utility provider, or that the geographic location of the site is such that compliance would result in a significant burden on the owner.

Section 2 establishes an effective date of April 1, 2023.

Justification

The presence of electric vehicle (EV) charging stations and parking spaces in a community is associated with greater use of EVs. However, the rate of adoption of EV parking spaces has been slow, mirrored by the slow adoption of EVs themselves. In 2021, New York State took steps to address to slow adoption of EVs by mandating new vehicles in the state be all-electric by 2035. For the adoption of this policy to be success- ful, the installation of the hardware needed to support a large number of EVs on the road should be a priority of the state. Accordingly, this bill seeks to align New York's construction and building code policy with the goals of the state expressed in the Climate Leadership and Community Protection Act as well as the 2021 EV sales mandate by mandat- ing the installation of EV infrastructure in certain instances during new construction.

Prior legislative history

New Bill

Fiscal implications

To be determined

Effective date

This act shall take effect April 1, 2023